Paragraph 90 I1
England, Wales and Scotland
In this Part of this Schedule—
-
“authorised development” has the same meaning as in article 2(1) (interpretation) of this Order and (unless otherwise specified) for the purposes of this Part of this Schedule includes the operation and maintenance of the authorised development and the construction of any works authorised by this Part of this Schedule;
-
“construction” includes execution, placing, altering, replacing, relaying and removal, and “construct” and “constructed” must be construed accordingly;
-
“drainage authority” means Essex County Council;
-
“drainage work” means works to any ordinary watercourse and includes any bank, wall, embankment or other structure, or any appliance constructed for land drainage or flood defence for which the drainage authority is the consenting authority;
-
“ordinary watercourse” has the meaning given by section 72 (interpretation) of the Land Drainage Act 1991;
-
“plans” includes sections, drawings, specifications and method statements;
-
“specified work” means so much of the authorised development as is in, on, under, over or within 8 metres of a drainage work or is otherwise likely to affect the flow of water in any watercourse.
Annotations
Commencement
- I1
Sch. 15 para. 90 in force at 18.7.2023, see art. 1