Schedule 5 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIREDI1
England, Wales and Scotland
(1) Plot reference number shown on land plans | (2) Purpose for which rights over land may be acquired | (3) Relevant part of the authorised development |
|---|---|---|
| Land Plans – Sheet 2 | ||
| 2/3/a | New right to install, operate and maintain lighting columns and cables including access with or without vehicles plant and machinery. | Work No. 16 |
| 2/4/b | New right to construct, divert, remove, use and maintain utility connections and equipment including a mains gas pipeline including access with or without vehicles plant and machinery. New right to construct and maintain noise bund No.1. | Work No. 22 |
| Land Plans – Sheet 3 | ||
| 3/14/a | New right to construct, operate and maintain the Church Road overbridge and related works and mitigation measures including access with or without vehicles plant and machinery. | Work No. 8 |
| 3/16/d | New right to construct, divert, remove, use and maintain utility connections and equipment including a mains gas pipeline including access with or without vehicles plant and machinery. | Work No. 22 |
| 3/16/g | New right to construct, divert, remove, use and maintain utility connections and equipment including a mains gas pipeline including access with or without vehicles plant and machinery. | Work No. 22 |
| Land Plans – Sheet 4 | ||
| 4/1/d | New right to construct, use and maintain environmental mitigation measures including access with or without vehicles plant and machinery. | Work Nos. 1-29 |
| 4/16/a | New right to construct, use and maintain environmental mitigation measures including access with or without vehicles plant and machinery. | Work Nos. 1-29 |
| 4/16/b | New right to construct, use and maintain environmental mitigation measures including access with or without vehicles plant and machinery. | Work Nos. 1-29 |
Annotations
Commencement
- I1
Sch. 5 in force at 22.12.2017, see art. 1