Schedule 5 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIREDI1

England, Wales and Scotland

(1)

Plot reference number shown on land plans

(2)

Purpose for which rights over land may be acquired

(3)

Relevant part of the authorised development

Land Plans – Sheet 2
2/3/aNew right to install, operate and maintain lighting columns and cables including access with or without vehicles plant and machinery.Work No. 16
2/4/bNew right to construct, divert, remove, use and maintain utility connections and equipment including a mains gas pipeline including access with or without vehicles plant and machinery. New right to construct and maintain noise bund No.1.Work No. 22
Land Plans – Sheet 3
3/14/aNew right to construct, operate and maintain the Church Road overbridge and related works and mitigation measures including access with or without vehicles plant and machinery.Work No. 8
3/16/dNew right to construct, divert, remove, use and maintain utility connections and equipment including a mains gas pipeline including access with or without vehicles plant and machinery.Work No. 22
3/16/gNew right to construct, divert, remove, use and maintain utility connections and equipment including a mains gas pipeline including access with or without vehicles plant and machinery.Work No. 22
Land Plans – Sheet 4
4/1/dNew right to construct, use and maintain environmental mitigation measures including access with or without vehicles plant and machinery.Work Nos. 1-29
4/16/aNew right to construct, use and maintain environmental mitigation measures including access with or without vehicles plant and machinery.Work Nos. 1-29
4/16/bNew right to construct, use and maintain environmental mitigation measures including access with or without vehicles plant and machinery.Work Nos. 1-29

Annotations

Commencement

I1

Sch. 5 in force at 22.12.2017, see art. 1