The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016
S.I. 2016/863 · Made 2 September 2016 · Extends to England, Wales and Scotland
Infrastructure Planning
Made 2nd September 2016
Coming into force 23rd September 2016
The application was examined by a Panel of three members (“the Panel”) (appointed by the Secretary of State) in accordance with Chapter 3 of Part 6 of the 2008 Act, and the Infrastructure Planning (Examination Procedure) Rules 2010f3.
The Panel, having examined the application with the documents that accompanied the application, and the representations made and not withdrawn, has, in accordance with section 83(1) of the 2008 Act, submitted a report and recommendation to the Secretary of State.
The Secretary of State, having considered the representations made and not withdrawn, and the report of the Panel, has decided to make an Order granting development consent for the development described in the application with modifications which in the opinion of the Secretary of State do not make any substantial changes to the proposals comprised in the application.
The Secretary of State has considered the effect of the following Order upon land which is open space in accordance with section 131 of the 2008 Act and is satisfied that subsection (4B) of that section applies to such land.
The Secretary of State has considered the effect of the following Order upon land which is common land in plot 20-03 identified in the book of reference and on the land plans in accordance with section 131 of the 2008 Act and is satisfied that subsection (5) of that section applies to such land.
The Secretary of State, in exercise of the powers conferred by sections 114, 115, 117, 120 and 122 of, and paragraphs 1 to 3, 10 to 17, 24, 26, 33, 36 and 37 of Part 1 of Schedule 5 to, the 2008 Act, makes the following Order—
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of the Localism Act 2011 (c. 20).
- f2
-
S.I. 2009/2264 as amended by S.I. 2010/602, S.I. 2012/635, S.I. 2012/2654, S.I, 2012/2732, S.I. 2013/522 and S.I. 2013/755.
- f3
-
S.I. 2010/103 as amended by S.I. 2012/635.
Contents
- Part 1: PRELIMINARY
- 1Citation and commencement
- 2Interpretation
- Part 2: PRINCIPAL POWERS
- 3Development consent etc. granted by the Order
- 4Maintenance of authorised development
- 5Planning permission
- 6Power to deviate
- 7Benefit of the Order
- 8Consent to transfer benefit of the Order
- Part 3: STREETS
- 9Application of the 1991 Act
- 10Power to alter layout etc. of streets
- 11Street works
- 12Construction and maintenance of new, altered or diverted streets
- 13Permanent stopping up of streets
- 14Temporary stopping up of streets
- 15Access to works
- 16Powers in relation to relevant navigations or watercourses
- Part 4: SUPPLEMENTAL POWERS
- 17Discharge of water
- 18Protective work to buildings
- 19Authority to survey and investigate the land
- Part 5: POWERS OF ACQUISITION
- 20Compulsory acquisition of land
- 21Time limit for exercise of authority to acquire land compulsorily
- 22Compulsory acquisition of rights
- 23Private rights over land
- 24Application of the Compulsory Purchase (Vesting Declarations) Act 1981
- 25Acquisition of subsoil or air-space only
- 26Acquisition of part of certain properties
- 27Rights under or over streets
- 28Temporary use of land for carrying out the authorised development
- 29Temporary use of land for maintaining the authorised development
- 30Statutory undertakers
- 31Apparatus and rights of statutory undertakers in stopped up streets
- 32Recovery of costs of new connections
- 33Compulsory acquisition of land – incorporation of the mineral code
- 34Special category land
- Part 6: MISCELLANEOUS AND GENERAL
- 35Felling or lopping of trees
- 36Trees subject to tree preservation orders
- 37Operational land for purposes of the 1990 Act
- 38Defence to proceedings in respect of statutory nuisance
- 39Protection of interests
- 40Certification of plans, etc.
- 41Service of notices
- 42Arbitration
- 43Traffic regulation
- 44Procedure in relation to certain approvals etc.
- Signature
- Schedule 1AUTHORISED DEVELOPMENT
- Schedule 2
- Part 1: REQUIREMENTS
- 1Interpretation
- 2Time limits
- 3Detailed design
- 4Gantry design
- 5Carriageway surfacing
- 6Engineering drawings, sections and other information
- 7Environmental Management Plan
- 8Construction Environmental Management Plan
- 9Implementation and maintenance of landscaping
- 10Fencing
- 11Ecological mitigation
- 12Contaminated land and groundwater
- 13Protected species
- 14Surface water drainage
- 15Archaeological remains
- 16Written scheme of investigation
- 17Buildings at risk
- 18Construction traffic management
- 19Permanent lighting
- 20Amendments to approved details
- 21Control of noise during construction of the scheme
- 22Acoustic barriers
- 23Flood risk
- 24Biodiversity management strategy
- 25Road restraint standard
- 26Air quality monitoring and management
- Part 2: PROCEDURE FOR DISCHARGE OF REQUIREMENTS
- 27Applications made under requirement
- 28Further information
- 29Register of requirements
- 30Details of consultation
- Schedule 3PERMANENT STOPPING UP OF STREETS FOR WHICH A SUBSITUTE IS TO BE PROVIDED
- Schedule 4TEMPORARY STOPPING UP OF STREETS
- Schedule 5LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
- Schedule 6: MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS
- Compensation enactments
- 1Paragraph 1
- 2Paragraph 2
- Application of the 1965 Act
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- Schedule 7LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
- Schedule 8TREES SUBJECT TO TREE PRESERVATION ORDERS
- Schedule 9: PROTECTION OF INTERESTS
- Part 1: FOR THE PROTECTION OF ELECTRICITY, GAS, OIL, WATER AND SEWERAGE UNDERTAKERS
- 1Paragraph 1
- 2Paragraph 2
- Chapter: On street apparatus
- 3Paragraph 3
- Chapter: Apparatus in stopped up streets
- 4Paragraph 4
- Chapter: Protective works to buildings
- 5Paragraph 5
- Chapter: Acquisition of land
- 6Paragraph 6
- Chapter: Removal of apparatus
- 7Paragraph 7
- Chapter: Facilities and rights for alternative apparatus
- 8Paragraph 8
- Chapter: Retained apparatus
- 9Paragraph 9
- Chapter: Expenses and costs
- 10Paragraph 10
- 11Paragraph 11
- Chapter: Co-operation
- 12Paragraph 12
- 13Paragraph 13
- Part 2: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- Part 3: FOR THE PROTECTION OF RAILWAY INTERESTS
- 20Paragraph 20
- 21Paragraph 21
- 22Paragraph 22
- 23Paragraph 23
- 24Paragraph 24
- 25Paragraph 25
- 26Paragraph 26
- 27Paragraph 27
- 28Paragraph 28
- 29Paragraph 29
- 30Paragraph 30
- 31Paragraph 31
- 32Paragraph 32
- 33Paragraph 33
- 34Paragraph 34
- 35Paragraph 35
- 36Paragraph 36
- 37Paragraph 37
- 38Paragraph 38
- 39Paragraph 39
- 40Paragraph 40
- Part 4: FOR THE PROTECTION OF NATIONAL GRID
- 41Application
- 42Interpretation
- 43Interpretation
- 44Apparatus of National Grid in stopped up streets
- 45Protective works to buildings
- 46Acquisition of land
- 47Removal of apparatus
- 48Facilities and rights for alternative apparatus
- 49Retained apparatus: protection for gas undertakers
- 50Retained apparatus: protection for electricity undertakers
- 51Expenses
- 52Indemnity
- 53Enactments and agreements
- 54Co-operation
- 55Access
- 56Arbitration
- Part 5: FOR THE PROTECTION OF UNITED KINGDOM OIL PIPELINES LIMITED AND WEST LONDON PIPELINE AND STORAGE LIMITED
- 57Paragraph 57
- 58Paragraph 58
- 59On street apparatus
- 60Apparatus in stopped up streets
- 61Protective works to buildings
- 62Acquisition of land
- 63Removal of apparatus
- 64Facilities and rights for alternative apparatus
- 65Retained apparatus
- 66Expenses and costs
- 67Expenses and costs
- 68Co-operation
- 69Co-operation
- Part 6: FOR THE PROTECTION OF THE ENVIRONMENT AGENCY
- 70Paragraph 70
- 71Paragraph 71
- 72Paragraph 72
- 73Paragraph 73
- 74Paragraph 74
- 75Paragraph 75
- 76Paragraph 76
- 77Paragraph 77
- 78Paragraph 78
- 79Paragraph 79
- Part 7: FOR THE PROTECTION OF THAMES WATER
- 80Access to Slough Sewage Treatment Works
- 81Iver South Sludge Dewatering Centre
- 82Iver South Sludge Dewatering Centre
- Part 8: FOR THE PROTECTION OF SOUTH EAST WATER
- 83Paragraph 83
- 84Paragraph 84
- 85On street apparatus
- 86Apparatus in stopped up streets
- 87Protective works to buildings
- 88Acquisition of land
- 89Removal of apparatus
- 90Facilities and rights for alternative apparatus
- 91Retained apparatus
- 92Expenses and costs
- 93Expenses and costs
- 94Co-operation
- 95Co-operation
- Part 9: FOR THE PROTECTION OF HEATHROW AIRPORT LIMITED
- 96Paragraph 96
- 97Paragraph 97
- 98Paragraph 98
- 99Paragraph 99
- Part 10: FOR THE PROTECTION OF SSE SERVICES PLC AND SOUTHERN ELECTRIC POWER DISTRIBUTION PLC
- 100Paragraph 100
- 101Paragraph 101
- Chapter: On street apparatus
- 102Paragraph 102
- Chapter: Apparatus in stopped up streets
- 103Paragraph 103
- Chapter: Protective works to buildings
- 104Paragraph 104
- Chapter: Acquisition of land
- 105Paragraph 105
- Chapter: Removal of apparatus
- 106Paragraph 106
- Chapter: Facilities and rights for alternative apparatus
- 107Paragraph 107
- Chapter: Retained apparatus
- 108Paragraph 108
- Chapter: Expenses and costs
- 109Paragraph 109
- 110Paragraph 110
- Chapter: Co-operation
- 111Paragraph 111
- 112Paragraph 112
- Schedule 10DOCUMENTS SUBJECT TO CERTIFICATION
- Schedule 11: PROCEDURE FOR DISCHARGE OF CERTAIN APPROVALS
- 1Applications made for certain approvals
- 2Further information
- 3Fees
- 4Appeals
- 5Interpretation of Schedule 11
- Schedule 12ENGINEERING DRAWINGS, SECTIONS AND OTHER INFORMATION
- Explanatory note