OpenLegislation

Article 2

Original text. Later amendments are not shown.

In this Order:-

  • “the M48” means (i) the westbound carriageway of the M48 over the Severn Bridge from the tip of the nosing of the westbound exit slip road at Junction 1 to the tip of the nosing of the westbound entry slip road at Junction 2; and (ii) the eastbound carriageway of the M48 over the Severn Bridge from the tip of the nosing of the eastbound exit slip road at Junction 2 to the tip of the nosing of the eastbound entry slip road at Junction 1;

  • “the slip roads” mean (i) the eastbound entry slip road at M48 Junction 2; and (ii) the westbound entry slip road at M48 Junction 1;

  • “the tip of the nosing” means the first point where an entry slip road joins the carriageway of a motorway or the last point where an exit slip road leaves the carriageway of a motorway;

  • “event” means the Severn Bridge Half Marathon; and

  • “the event period” means a period of 5 hours starting at 07.30 hours on Sunday 29th August 2021.