Schedule 1 AUTHORISED DEVELOPMENTI1
England and Wales
The authorised development is a nationally significant infrastructure project as defined in sections 14 and 22 of the 2008 Actf1 and associated development within the meaning of section 115(2) of the 2008 Act, comprising—
Work No. 1 – the construction of a new Junction 10 on the M5 Motorway made up of four new slip roads, at the location shown on sheets 1 to 10, 12 and 15 of the works plans, to include—
the construction of motorway signage and associated cabling and ducting works;
the construction of a new northbound exit slip from the M5 to the A4019;
the construction of a new southbound exit slip from the M5 to the A4019;
the construction of a new southbound entry slip from the A4019 to the M5;
the construction of a new northbound entry slip from the A4019 to the M5;
the demolition of the existing M5 northbound entry slip;
the demolition of the existing M5 southbound exit slip;
the construction of drainage attenuation basin (3) with associated drainage facilities, access and landscaping southwest of Junction 10 at the location shown on sheet 6 of the works plans;
construction compound no. 1 of 37,300 square metres southwest of Junction 10 at the location shown on sheets 5 and 6 of the works plans;
construction compound no. 2 of 47,500 square metres northwest of Junction 10 at the location shown on sheets 4 and 5 of the works plans;
construction compound no. 3 of 53,800 square metres northeast of Junction 10 at the location shown on sheets 5 and 12 of the works plans;
the construction of drainage attenuation basin (2) with associated drainage facilities, access and landscaping northwest of Junction 10 at the location shown on sheets 4 and 5 of the works plans;
the extension of the Leigh Brook culvert (also known as the Barn Farm culvert);
the construction of an environmental barrier adjacent to Barn Farm north of Junction 10 and west of the M5 at the location shown on sheet 4 of the works plans;
the construction of an environmental barrier adjacent to land housing a traveller site north of Junction 10 and east of the M5 at the location shown on sheets 4 and 5 of the works plans;
construction compound no. 9 of 48,300 square metres south of Junction 10 at the location shown on sheets 6 and 15 of the works plans.
Work No. 2 – the construction of a new grade separated roundabout junction and maintenance bays at the location shown on sheets 4 and 5 of the works plans, to include—
the construction of a new roundabout over the M5 comprising a circulatory carriageway and the Piffs Elm interchange bridges (north and south);
landscaping northwest of Junction 10;
the extension of the Piffs Elm culvert;
the demolition of the existing A4019 bridge over the M5;
the demolition of 14 properties at Withybridge Gardens southeast of Junction 10;
the demolition of Sheldon Nurseries northwest of Junction 10;
the demolition of Barn Farm Cottage north of Junction 10;
the demolition of Wayside northwest of Junction 10;
the demolition of Bridge House northwest of Junction 10.
Work No. 3 – the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 for 550 metres with associated footway; cycle track; shared use path; private access points; and signage and ducting at the location shown on sheets 5, 6 and 11 of the works plans, to include—
the realignment of the unclassified road known as Stanboro Lane / Piffs Elm Lane;
the construction of drainage attenuation basin (1) with associated drainage facilities, access and landscaping north of the A4019 (Tewkesbury Road);
the diversion of a public right of way (FP ABO14) to the south side of the A4019 (Tewkesbury Road);
the construction of new or altered private means of access;
the provision of a flood compensation area at the location shown on sheets 5 and 11 of the works plans.
Work No. 4 – the realignment and dualling of the A4019 (Tewkesbury Road) with associated footway; cycle track; shared use paths; private means of access; and signage and ducting southeast of Junction 10 for 2.7 kilometres to a point east of the Gallagher Junction at the location shown on sheets 5, 6, 12, 13 and 14 of the works plans, to include—
the demolition of Withy Bridge and Laburnum properties north of the A4019 (Tewkesbury Road);
the construction of an underpass beneath the A4019 (Tewkesbury Road) east of Junction 10 270 metres northwest of Withybridge Lane;
the diversion and construction of bridleway BR AUC1 under the A4019 (Tewkesbury Road);
the construction of drainage attenuation basin (4) with associated drainage facilities, access and landscaping southeast of Junction 10;
the demolition of three properties (Nos 1 - 3 The Row) in Uckington south of the A4019 (Tewkesbury Road);
the construction of a signalised junction including access to land north of the A4019 (Tewkesbury Road); pedestrian and cycle crossing points; maintenance bay; and southern access to the new West Cheltenham Link Road;
the construction of new or altered private means of access;
the removal of an existing layby south of the A4019 (Tewkesbury Road);
construction compound no. 4 of 50,100 square metres north of the A4019 (Tewkesbury Road) at the location shown on sheet 12 of the works plans;
mitigation planting for dormice;
the construction of an environmental barrier 160 metres in length south of the A4019 (Tewkesbury Road) adjacent to Cooks Lane;
the demolition of buildings at Manor Farm west and southwest of Uckington Junction;
the construction of a signalised junction serving Moat Lane and The Green with pedestrian and cycle crossing points and maintenance bay;
the construction of service roads running east and west of The Green;
the construction of environmental barriers west and east of The Green, north of the A4019 (Tewkesbury Road);
the construction of bat mitigation to the north of the A4019 (Tewkesbury Road), east of Uckington;
the construction of drainage attenuation basin (6) with associated drainage facilities, access and landscaping south of the A4019 (Tewkesbury Road);
the construction of a left turn exit for eastbound traffic into the development site known as Elms Park;
the construction of a signalised junction to access development (site access A) to the north of the A4019 (Tewkesbury Road) with pedestrian and cycle crossing points;
the construction of an environmental barrier south of the A4019 (Tewkesbury Road) between West Cheltenham Community Fire Station and just west of the entrance to the Cotswold Area Civil Service Sports Association;
the construction of a signalised junction to access development (site access B) to the north of the A4019 (Tewkesbury Road) with pedestrian and cycle crossing points;
the construction of a service road to the south of the A4019 (Tewkesbury Road) serving properties including the Cotswold Area Civil Service Sports Association; Homecroft Drive and the West Cheltenham Community Fire Station;
the demolition of ten properties to the north of the A4019 (Tewkesbury Road) between Uckington and the Gallagher Junction;
the alteration of the signalised junction serving Gallagher Retail Park and the B4634 to the south of the A4019 (Tewkesbury Road) with maintenance bay;
demolition of buildings forming part of Baileys Nursery west of Gallagher Retail Park access;
the construction of a public right of way (footpath) to link to diverted bridleway BR AUC1;
the construction of a lane on the eastbound carriageway including sections of bus lane, bus gates and left turn lane at the locations shown on sheets 13 and 14 of the works plans;
the realignment of Withybridge Lane for 150 metres connecting to the realigned and dualled A4019 (Tewkesbury Road) at the location shown on sheet 12 of the works plans.
Work No. 5 – the construction of a new West Cheltenham Link Road south of the A4019 (Tewkesbury Road) for 1.4 kilometres to join with the B4634 with footway and cycle track to the west and private access, signage and ducting at the location shown on sheets 6, 12, 15 and 16 of the works plans, to include—
the construction of a service road linking properties south of the A4019 (Tewkesbury Road) and Cooks Lane;
construction compound no. 5 of 36,400 square metres east of Withybridge Lane and west of the new West Cheltenham Link Road at the location shown on sheet 12 of the works plans;
construction compound no. 6 of 12,100 square metres east of the new West Cheltenham Link Road and south of the A4019 (Tewkesbury Road) at the location shown on sheet 12 of the works plans;
the construction of a new bridge over the River Chelt;
the diversion of public right of way FP AUC11 to the north of the River Chelt under the new River Chelt Bridge;
the diversion of public right of way FP ABO24 to the south of the River Chelt under the new River Chelt Bridge;
construction compound no. 7 of 28,100 square metres east of the new West Cheltenham Link Road at the location shown on sheet 15 of the works plans;
construction compound no. 8 of 9,600 square metres west of the new West Cheltenham Link Road at the location shown on sheet 16 of the works plans;
the construction of drainage attenuation basin (5) with associated drainage facilities, access and landscaping north of the B4634;
the construction of a signalised junction serving the new West Cheltenham Link Road, the B4634 and the West Cheltenham Golden Valley Development land, with pedestrian and cycle crossing points and maintenance layby;
the construction of new or altered private means of access;
the construction of the West Cheltenham Link bridge at the location shown on sheet 12 of the works plans;
the construction of the West Cheltenham Link bridge at the location shown on sheet 15 of the works plans;
the provision of a flood compensation area at the location shown on sheets 6, 12 and 15 of the works plans;
the provision of a flood compensation area at the location shown on sheets 12 and 15 of the works plans.
Work No. 6 – the realignment of the B4634 for 490 metres connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting at the location shown on sheets 7, 15 and 16 of the works plans, to include—
flood culverts group 1 under the B4634;
flood culverts group 2 under the B4634;
the construction of new or altered private means of access;
the provision of a flood compensation area at the location shown on sheets 7, 15 and 16 of the works plans.
Work No. 7 – the construction of a flood storage area of 102,421 square metres and associated works to the east of the M5 and south of the A4019 at the location shown on sheets 5, 6 and 12 of the works plans.
Work No. 8 – the diversion of 500 metres of telecommunication cable and associated apparatus and equipment at the location shown on sheet 16 of the works plans.
Work No. 9 – the diversion of 98 metres of telecommunication cable and associated apparatus and equipment at the location shown on sheet 16 of the works plans.
Work No. 10 – the diversion of 1585 metres of telecommunication cable and associated apparatus and equipment at the location shown on sheets 5, 11 and 12 of the works plans.
Work No. 11 – the diversion of 290 metres of telecommunication cable and associated apparatus and equipment at the location shown on sheet 13 of the works plans.
Work No. 12 – the diversion of 611 metres of telecommunication cable and associated apparatus and equipment at the location shown on sheet 16 of the works plans.
Work No. 13 – the diversion of 55 metres of telecommunication cable and associated apparatus and equipment at the location shown on sheet 13 of the works plans.
Work No. 14 – the diversion of 459 metres of water pipeline at the location shown on sheet 16 of the works plans.
Work No. 15 – the diversion of 7090 metres of water pipeline at the location shown on sheets 5, 12, 13 and 14 of the works plans.
Work No. 16 – the diversion of 1622 metres of gas main at the location shown on sheets 5, 12 and 13 of the works plans.
Work No. 17 – the diversion of 55 metres of gas main at the location shown on sheet 13 of the works plans.
Work No. 18 – the diversion of 1108 metres of gas main at the location shown on sheets 13 and 14 of the works plans.
Work No. 19 – the diversion of 202 metres of electric cable and associated apparatus and equipment at the location shown on sheet 5 of the works plans.
Work No. 20 – the diversion of 444 metres of electric cable and associated apparatus and equipment at the location shown on sheets 4 and 5 of the works plans.
Work No. 21 – the diversion of 129 metres of electric cable and associated apparatus and equipment at the location shown on sheet 12 of the works plans.
Work No. 22 – the diversion of 68 metres of electric cable and associated apparatus and equipment at the location shown on sheet 13 of the works plans.
Work No. 23 – the diversion of 76 metres of electric cable and associated apparatus and equipment at the location shown on sheet 13 of the works plans.
Work No. 24 – the diversion of 760 metres of electric cable and associated apparatus and equipment at the location shown on sheets 13 and 14 of the works plans.
Work No. 25 – the diversion of 68 metres of electric cable and associated apparatus and equipment at the location shown on sheet 16 of the works plans.
Work No. 26 – the diversion of 70 metres of electric cable and associated apparatus and equipment at the location shown on sheet 16 of the works plans.
Work No. 27 – the diversion of 3815 metres of telecommunication cable and associated apparatus and equipment at the location shown on sheets 5, 12, 13 and 14 of the works plans.
Work No. 28 – the diversion of 96 metres of telecommunication cable and associated apparatus and equipment at the location shown on sheet 11 of the works plans.
Work No. 29 – the diversion of 416 metres of telecommunication cable and associated apparatus and equipment at the location shown on sheet 12 of the works plans.
Work No. 30 – the diversion of 122 metres of telecommunication cable and associated apparatus and equipment at the location shown on sheet 12 of the works plans.
Work No. 31 – the diversion of 211 metres of telecommunication cable and associated apparatus and equipment at the location shown on sheet 13 of the works plans.
Work No. 32 – the diversion of 234 metres of telecommunication cable and associated apparatus and equipment at the location shown on sheets 13 and 14 of the works plans.
Work No. 33 – the diversion of 258 metres of telecommunication cable and associated apparatus and equipment at the location shown on sheet 14 of the works plans.
Work No. 34 – the diversion of 485 metres of telecommunication cable and associated apparatus and equipment at the location shown on sheet 16 of the works plans.
Work No. 35 – the diversion of 170 metres of gas main at the location shown on sheet 15 of the works plans.
Work No 36 – the relocation of an existing national roads telecommunications service transmission station and associated infrastructure, to include—
demolition of the existing national roads telecommunication service transmission station and associated infrastructure; and
construction of a new national roads telecommunication service transmission station and associated infrastructure.
In connection with the construction of any of those works, further associated development within the Order limits consisting of—
works required for the strengthening, improvement, maintenance or reconstruction of any street;
the strengthening, alteration or demolition of any structure;
ramps, means of access including private means of access, public rights of way and crossing facilities;
embankments, abutments, shafts, foundations, retaining walls, barriers, parapets, drainage, outfalls, ditches, wing walls, highway lighting, fencing and culverts;
works to place, alter, remove or maintain street furniture or apparatus in a street, or apparatus in other land, including mains, sewers, drains, pipes, cables and ducts;
works to alter the course of or otherwise interfere with a watercourse, including private water supplies;
landscaping, noise bunds and barriers, works associated with the provision of ecological mitigation and other works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;
works for the benefit or protection of land affected by the authorised development;
site preparation works, site clearance (including fencing, vegetation removal, demolition of existing structures), earthworks (including soil stripping and storage, site levelling), remediation of contamination;
the felling of trees;
working sites, storage areas, temporary vehicle parking, construction fencing, perimeter enclosure, security fencing, construction-related buildings, temporary worker accommodation facilities, welfare facilities, construction lighting, haulage roads and other buildings, machinery, apparatus, works and conveniences; and
the provision of other works including pavement works, kerbing and paved areas works, signing, signals, gantries, road markings works, traffic management measures including temporary roads and such other works as are associated with the construction of the authorised development.
Annotations
Commencement
Footnotes
- f1
-
Section 22 was substituted by S.I. 2013/1883.