Schedule 7 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKENI1
England and Wales
| (1) Plot Reference Number shown on land plans | (2) Purpose for which temporary possession may be taken | (3) Relevant part of the authorised development |
|---|---|---|
| Land Plans – Sheet 1 | ||
| 1/1a | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 1/1a(i) | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 1/1a(ii) | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 1/1b | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 1A/1a | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 1A/1a(i) | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 1A/1a(ii) | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 1A/1b | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| Land Plans – Sheet 2 | ||
| 2/1a | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 2/1a(i) | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 2/1b | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 2/1c | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 2/1d | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 2/1e | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 2/2a | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| Land Plans – Sheet 3 | ||
| 3/1a | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 3/1b | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 3/1c | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 3/1d | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 3/1e | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 3/1f | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 3/2a | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 3/2c | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| Land Plans – Sheet 4 | ||
| 4/1a | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 4/1b | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 4/1c(i) | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 4/1e | Required for the construction of a new southbound exit slip from the M5 to the A4019 Required for the construction of an environmental barrier adjacent to land housing a traveller site north of Junction 10 and east of the M5 | 1c, 1o |
| 4/2a | Required for construction of an environmental barrier adjacent to Barn Farm north of Junction 10 and west of the M5 | 1n |
| 4/3g | Required for construction compound no. 2 northwest of Junction 10 | 1j |
| 4/3g(i) | Required for temporary working space for the construction of a new northbound entry slip from the A4019 to the M5 | 1e |
| 4/3i | Required for construction compound no. 2 northwest of Junction 10 | 1j |
| 4/3k | Required for construction compound no. 2 northwest of Junction 10 | 1j |
| 4/3l | Required for construction compound no. 2 northwest of Junction 10 | 1j |
| 4/3m | Required for construction compound no. 2 northwest of Junction 10 | 1j |
| Land Plans – Sheets 5 and 5A | ||
| 5/1a | Required for construction compound no. 2 northwest of Junction 10 | 1j |
| 5/1a(ii) | Required for construction compound no.2 northwest of Junction 10 | 1j |
| 5/1c | Required for construction compound no. 2 northwest of Junction 10 | 1j |
| 5/2a | Required for the construction of a new southbound exit slip from the M5 to the A4019 Required for the construction of a new northbound entry slip from the A4019 to the M5 | 1c, 1e |
| 5/2b | Required for the construction of a new southbound exit slip from the M5 to the A4019 Required for the extension of the Leigh Brook culvert (also known as the Barn Farm culvert) Required for the construction of an environmental barrier adjacent to land housing a traveller site north of Junction 10 and east of the M5 | 1c, 1m, 1o |
| 5/2c | Required for the construction of a new southbound exit slip from the M5 to the A4019 Required for the extension of the Leigh Brook culvert (also known as the Barn Farm culvert) Required for the construction of an environmental barrier adjacent to land housing a traveller site north of Junction 10 and east of the M5 | 1c, 1m, 1o |
| 5/2e | Required for the construction of a new northbound entry slip from the A4019 to the M5 Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the construction of a new roundabout over the M5 comprising a circulatory carriageway and the Piffs Elm interchange bridges (north and south) Required for the demolition of the existing NRTS Transmission Station and associated infrastructure | 1e, 2, 2a, 36a |
| 5/2f | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2g | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2q | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2s | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2t | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2u | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2v | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2w | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2x | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2bb | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2ff | Required for the construction of a new southbound exit slip from the M5 to the A4019 Required for the demolition of the existing M5 southbound exit slip Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 1c, 1g, 2, 2d, 4 |
| 5/2hh | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2ii | Required for the demolition of the existing M5 southbound exit slip Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the construction of an underpass west of Withybridge Lane Required for the diversion and construction of bridleway BR AUC1 under the A4019 (Tewkesbury Road) | 1g, 4, 4b, 4c |
| 5/2ll | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/2nn | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| 5/2qq | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| 5/2rr | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| 5/2tt | Required for the construction of motorway signage and associated cabling and ducting works Required for the construction of a new northbound exit slip from the M5 to the A4019 | 1a, 1b |
| 5/4c | Required for construction compound no. 3 northeast of Junction 10 | 1k |
| 5/4c(i) | Required for construction compound no. 3 northeast of Junction 10 | 1k |
| 5/4d | Required for construction compound no. 3 northeast of Junction 10 | 1k |
| 5/4d(i) | Required for construction compound no. 3 northeast of Junction 10 | 1k |
| 5/4d(ii) | Required for construction compound no. 3 northeast of Junction 10 | 1k |
| 5/4d(iii) | Required for construction compound no. 3 northeast of Junction 10 | 1k |
| 5/5a(i) | Required for construction compound no. 2 northwest of Junction 10 and protection of existing features | 1j |
| 5/5a(ii) | Required for construction compound no. 2 northwest of Junction 10 and protection of existing features | 1j |
| 5/5b(i) | Required for construction compound no. 2 northwest of Junction 10 | 1j |
| 5/6c | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the realignment of the unclassified road known as Stanboro Lane | 2, 3a |
| 5/6d | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/6d(i) | Required for the construction of a new grade separated roundabout junction and maintenance bays Required for the demolition of the existing A4019 bridge over the M5 | 2, 2d |
| 5/10c | Required for temporary working space for the construction of new or altered private means of access | 3d |
| 5/10e | Required for construction compound no. 1 southwest of Junction 10 | 1i |
| 5/10g | Required for construction compound no. 1 southwest of Junction 10 | 1i |
| 5/11a | Required for construction compound no. 4 north of the A4019 (Tewkesbury Road) | 1k |
| 5/31a(ii) | Required for construction compound no. 3 northeast of Junction 10 | 1k |
| 5/31b(ii) | Required for construction compound no. 3 northeast of Junction 10 | 1k |
| 5/31c(ii) | Required for construction compound no. 3 northeast of Junction 10 | 1k |
| 5/33d | Required for construction compound no. 3 northeast of Junction 10 | 1k |
| Land Plans – Sheet 6 | ||
| 6/1a | Required for construction compound no. 1 southwest of Junction 10 | 1i |
| 6/1b | Required for construction compound no. 1 southwest of Junction 10 | 1i |
| 6/1f | Required for construction compound no. 1 southwest of Junction 10 | 1i |
| 61f(i) | Required for construction compound no. 1 southwest of Junction 10 | 1i |
| 6/1h | Required for the construction of a new northbound exit slip from the M5 to the A4019 | 1b |
| 6/2a | Required for the construction of a new northbound exit slip from the M5 to the A4019 Required for the construction of a new southbound entry slip from the A4019 to the M5 | 1b, 1d |
| 6/2b | Required for the construction of a new northbound exit slip from the M5 to the A4019 Required for the construction of a new southbound entry slip from the A4019 to the M5 | 1b, 1d |
| 6/3c | Required for the construction of a new northbound exit slip from the M5 to the A4019 | 1b |
| 6/3c(i) | Required for the construction of a new northbound exit slip from the M5 to the A4019 | 1b |
| 6/3c(ii) | Required for the construction of a new northbound exit slip from the M5 to the A4019 | 1b |
| 6/3c(iii) | Required for the construction of a new northbound exit slip from the M5 to the A4019 | 1b |
| 6/4d | Required for construction compound no. 9 south of Junction 10 | 1p |
| 6/6a | Required for construction compound no. 9 south of Junction 10 | 1p |
| 6/6b | Required for construction compound no. 9 south of Junction 10 | 1p |
| 6/7a | Required for the realignment of Withybridge Lane connecting to the realigned and dualled A4019 (Tewkesbury Road) | 4bb |
| 6/9a | Required for the realignment of Withybridge Lane connecting to the realigned and dualled A4019 (Tewkesbury Road) | 4bb |
| Land Plans – Sheet 7 | ||
| 7/1a | Required for the construction of a new northbound exit slip from the M5 to the A4019 | 1b |
| 7/1a(i) | Required for the construction of a new northbound exit slip from the M5 to the A4019 | 1b |
| 7/2a | Required for the construction of motorway signage and associated cabling and ducting works and associated works Required for the construction of a new northbound exit slip from the M5 to the A4019 | 1a, 1b |
| 7/2a(i) | Required for the construction of motorway signage and associated cabling and ducting works and associated works Required for the construction of a new northbound exit slip from the M5 to the A4019 | 1a, 1b |
| 7/2a(ii) | Required for the construction of motorway signage and associated cabling and ducting works and associated works Required for the construction of a new northbound exit slip from the M5 to the A4019 | 1a, 1b |
| 7/2b | Required for the construction of motorway signage and associated cabling and ducting works | 1a |
| 7/2c | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 7/3d | Required for the construction of a new southbound entry slip from the A4019 to the M5 | 1d |
| 7/3d(i) | Required for the construction of a new southbound entry slip from the A4019 to the M5 | 1d |
| Land Plans – Sheet 8 | ||
| 8/1a | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 8/1b | Required for the construction of motorway signage and associated cabling and ducting works and associated works Required for the demolition of the existing NRTS Transmission Station and associated infrastructure | 1a, 36b |
| Land Plans – Sheet 9 | ||
| 9/1a | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 9/1b | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 9/1c | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 9/1d | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 9/1e | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 9/1e(i) | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 9/1e(ii) | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 9/1f | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| Land Plans – Sheet 10 | ||
| 10/1a | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 10/1b | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 10/1c | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 10/1c(i) | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 10/1d | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 10/1e | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 10/1e(i) | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 10/1e(ii) | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 10/1e(iii) | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 10/2a | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| 10/3a | Required for the construction of motorway signage and associated cabling and ducting works and associated works | 1a |
| Land Plans – Sheet 11 | ||
| 11/1f | Required for the construction of new or altered private means of access | 3d |
| 11/3c | Required for the realignment and widening of the A4019 (Tewkesbury Road) northwest of Junction 10 with associated footway, cycleway, shared use path, private access points, signage and ducting | 3 |
| Land Plans – Sheets 12 and 12A | ||
| 12/1a | Required for construction compound no. 4 north of the A4019 (Tewkesbury Road) | 4i |
| 12/1d | Required for construction compound no. 4 north of the A4019 (Tewkesbury Road) | 4i |
| 12/2a | Required for construction compound no. 4 north of the A4019 (Tewkesbury Road) Required for mitigation planting for dormice | 4i, 4j |
| 12/2f | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the realignment of Withybridge Lane connecting to the realigned and dualled A4019 (Tewkesbury Road) Required for the diversion of telecommunication cable and associated apparatus and equipment Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 4bb, 10, 29 |
| 12/2g | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 10 |
| 12/2h | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 10 |
| 12/2j | Required for construction compound no. 5 east of Withybridge Lane and west of the new West Cheltenham Link Road | 5b |
| 12/2l | Required for construction compound no. 5 east of Withybridge Lane and west of the new West Cheltenham Link Road | 5b |
| 12/2m | Required for construction compound no. 5 east of Withybridge Lane and west of the new West Cheltenham Link Road | 5b |
| 12/2n | Required for the construction of a service road linking properties south of the A4019 (Tewkesbury Road) and Cooks Lane Required for the diversion of telecommunication cable and associated apparatus and equipment | 5a, 30 |
| 12/2o | Required for the construction of a service road linking properties south of the A4019 (Tewkesbury Road) and Cooks Lane | 5a |
| 12/2o(i) | Required for construction compound no. 6 east of the new West Cheltenham Link Road and south of the A4019 (Tewkesbury Road) | 5c |
| 12/2q | Required for the construction of a service road linking properties south of the A4019 (Tewkesbury Road) and Cooks Lane | 5a |
| 12/2r | Required for the construction of a service road linking properties south of the A4019 (Tewkesbury Road) and Cooks Lane | 5a |
| 12/2s | Required for construction compound no. 6 east of the new West Cheltenham Link Road and south of the A4019 (Tewkesbury Road) Required for the diversion of National Grid Electricity Distribution PLC electric cable and associated apparatus and equipment | 5c, 21 |
| 12/2t | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the removal of an existing layby south of the A4019 (Tewkesbury Road) Required for the construction of an environmental barrier south of the A4019 (Tewkesbury Road) west of Cooks Lane Junction Required for the construction of a service road linking properties south of the A4019 (Tewkesbury Road) and Cooks Lane Required for the diversion of telecommunication cable and associated apparatus and equipment Required for the diversion of Severn Trent Water Limited water pipeline Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 4h, 4k, 5a, 10, 15, 30 |
| 12/2u | Required for the construction of new or altered private means of access Required for the diversion of National Grid Electricity Distribution PLC electric cable and associated apparatus and equipment | 5k, 21 |
| 12/2y | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 10 |
| 12/2aa | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| 12/7c | Required for construction compound no. 4 north of the A4019 (Tewkesbury Road) | 4i |
| 12/7e | Required for construction compound no. 4 north of the A4019 (Tewkesbury Road) | 4i |
| 12/7e(i) | Required for realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| 12/7f | Required to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 12/7h | Required to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 12/8a | Required to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 12/14a | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| 12/15a | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| 12/17a | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| Land Plans – Sheets 13 and 13A | ||
| 13/1b | Required to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 13/1c | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| 13/1f | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| 13/2a | Required to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 13/2c | Required to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 13/3a | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| 13/3c | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the construction of environmental barriers west and east of The Green, north of the A4019 (Tewkesbury Road) Required for the construction of a service road running east and west of The Green Required for the diversion of telecommunication cable and associated apparatus and equipment Required for the diversion of Severn Trent Water Limited water pipeline Required for the diversion of telecommunication cable and associated apparatus and equipment Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 4n, 4o, 11, 15, 27, 31 |
| 13/3e | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the construction of new or altered private means of access Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 4g, 11 |
| 13/3f | Required for the construction of new or altered private means of access Required for the diversion of telecommunication cable and associated apparatus and equipment | 4g, 31 |
| 13/3g | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the construction of new or altered private means of access Required for the construction of a signalised junction serving Moat Lane and The Green with pedestrian and cycle crossing points and maintenance bay Required for the construction of a service road running east and west of The Green Required for the construction of environmental barriers west and east of The Green, north of the A4019 (Tewkesbury Road) Required for the diversion of telecommunication cable and associated apparatus and equipment Required for the diversion of Severn Trent Water Limited water pipeline Required for the diversion of Wales & West Utilities Limited gas main Required for the diversion of National Grid Electricity Distribution PLC electric cable and associated apparatus and equipment Required for the diversion of telecommunication cable and associated apparatus and equipment Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 4g, 4m, 4n, 4o, 11, 15, 17, 22, 27, 31 |
| 13/3g(i) | Required for the construction of a signalised junction serving Moat Lane and The Green with pedestrian and cycle crossing points and maintenance bay Required for the diversion of Severn Trent Water Limited water pipeline | 4m, 15 |
| 13/3g(ii) | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the construction of new or altered private means of access Required for the construction of a signalised junction serving Moat Lane and The Green with pedestrian and cycle crossing points and maintenance bay Required for the diversion of telecommunication cable and associated apparatus and equipment Required for the diversion of Wales & West Utilities Limited gas main Required for the diversion of National Grid Electricity Distribution PLC electric cable and associated apparatus and equipment | 4, 4g, 4m, 11, 17, 22 |
| 13/3i | Required for the construction of new or altered private means of access Required for the demolition of buildings at Manor Farm west and southwest of Uckington Junction | 4g, 4l |
| 13/3j | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the construction of a signalised junction serving Moat Lane and The Green with pedestrian and cycle crossing points and maintenance bay Required for the diversion of Severn Trent Water Limited water pipeline Required for the diversion of Wales & West Utilities Limited gas main Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 4m, 15, 17, 27 |
| 13/3k | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the construction of a signalised junction serving Moat Lane and The Green with pedestrian and cycle crossing points and maintenance bay Required for the diversion of Wales & West Utilities Limited gas main | 4, 4m, 17 |
| 13/3m | Required for the construction of a signalised junction serving Moat Lane and the Green with pedestrian and cycle crossing points and maintenance bay Required for the diversion of telecommunication cable and associated apparatus and equipment | 4m, 31 |
| 13/3p | Required for the diversion of National Grid Electricity Distribution plc electric cable and associated apparatus and equipment | 23 |
| 13/3r | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the construction of a service road running east and west of The Green Required for the construction of environmental barriers west and east of The Green, north of the A4019 (Tewkesbury Road) Required for the diversion of Severn Trent Water Limited water pipeline Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 4n, 4o, 15, 27 |
| 13/3s | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the construction of new or altered private means of access Required for the construction of a service road running east and west of The Green Required for the construction of an environmental barrier south of the A4019 (Tewkesbury Road) between West Cheltenham Community Fire Station and the entrance to the Cotswold Area Civil Service Sports Association Required for the construction of a service road to the south of the A4019 (Tewkesbury Road) serving properties including the Cotswold Area Civil Service Sports Association; Homecroft Drive and the West Cheltenham Community Fire Station Required for the diversion of telecommunication cable and associated apparatus and equipment Required for the diversion of Severn Trent Water Limited water pipeline Required for the diversion of Wales & West Utilities Limited gas main Required for the diversion of National Grid Electricity Distribution PLC electric cable and associated apparatus and equipment Required for the diversion of National Grid Electricity Distribution PLC electric cable and associated apparatus and equipment Required for the diversion telecommunication cable and associated apparatus and equipment Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 4g, 4n, 4t, 4v, 13, 15, 18, 23, 24, 27, 32 |
| 13/3y | Required for the construction of drainage attenuation basin (6) with associated drainage facilities, access and landscaping south of the A4109 (Tewkesbury Road) | 4q |
| 13/3bb | Required for the construction of a service road to the south of the A4019 (Tewkesbury Road) serving properties including the Cotswold Area Civil Service Sports Association; Homecroft Drive and the West Cheltenham Community Fire Station Required for the diversion of Wales & West Utilities Limited gas main Required for the diversion of National Grid Electricity Distribution PLC electric cable and associated apparatus and equipment Required for the diversion of 258 metres of telecommunication cable and associated apparatus and equipment | 4v, 18, 24, 32 |
| 13/3cc | Required for the construction of new or altered private means of access | 4g |
| 13/3dd | Required for the construction of new or altered private means of access | 4g |
| 13/3ff | Required for the construction of a service road to the south of the A4019 (Tewkesbury Road) serving properties including the Cotswold Area Civil Service Sports Association; Homecroft Drive and the West Cheltenham Community Fire Station Required for the diversion of Wales & West Utilities Limited gas main Required for the diversion of National Grid Electricity Distribution PLC electric cable and associated apparatus and equipment Required for the diversion of telecommunication cable and associated apparatus and equipment | 4v, 18, 24, 32 |
| 13/3gg | Required for the construction of a signalised junction to access development (site access A) to the north of the A4019 (Tewkesbury Road) with pedestrian and cycle crossing points | 4s |
| 13/3hh | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| 13/3ii | Required for the construction of new or altered private means of access Required for the construction of service roads running east and west of The Green | 4g, 4n |
| 13/4a | Required to construct, use, protect, inspect and maintain mitigation planting for dormice | 4j |
| 13/10a | Required for the construction of new or altered private means of access Required for the construction of service roads running east and west of The Green | 4g, 4n |
| Land Plans – Sheet 14 | ||
| 14/1a | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| 14/1a(i) | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the demolition of buildings forming part of Baileys Nursery, west of Gallagher Retail Park access Required for the diversion of electric cable and associated apparatus and equipment | 4, 4y, 24 |
| 14/1a(ii) | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the diversion of electric cable and associated apparatus and equipment | 4, 24 |
| 14/1c | Realignment and dualling of the A4019 (Tewkesbury Road) with associated footway; cycleway; shared use paths; private means of access; and signage and ducting southeast of Junction 10 for 2.7 kilometres to a point east of the Gallagher Junction Required for the construction of new or altered private means of access Required for the construction of an environmental barrier south of the A4019 (Tewkesbury Road) between West Cheltenham Community Fire Station and the entrance to the Cotswold Area Civil Service Sports Association Required for the construction of a service road to the south of the A4019 (Tewkesbury Road) serving properties including the Cotswold Area Civil Service Sports Association; Homecroft Drive and the West Cheltenham Community Fire Station Required for the alteration of the signalised junction serving Gallagher Retail Park and the B4634 to the south of the A4019 (Tewkesbury Road) with maintenance bay Required for the construction of a lane on the eastbound carriageway and associated works Required for the diversion of Severn Trent Water Limited water pipeline Required for the diversion of Wales & West Utilities Limited gas main Required for the diversion of telecommunication cable and associated apparatus and equipment Required for the diversion of telecommunication cable and associated apparatus and equipment Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 4g, 4t, 4v, 4x, 4aa, 15, 18, 27, 32, 33 |
| 14/1c(i) | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the alteration of the signalised junction serving Gallagher Retail Park and the B4634 to the south of the A4019 (Tewkesbury Road) with maintenance bay Required for the diversion of Severn Trent Water Limited water pipeline Required for the diversion of Wales & West Utilities Limited gas main | 4, 4x, 15, 18 |
| 14/1c(ii) | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the alteration of the signalised junction serving Gallagher Retail Park and the B4634 to the south of the A4019 (Tewkesbury Road) with maintenance bay Required for the construction of a lane on the eastbound carriageway and associated works Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 4x, 4aa, 27 |
| 14/1c(iii) | Required for the alteration of the signalised junction serving Gallagher Retail Park and the B4634 to the south of the A4019 (Tewkesbury Road) with maintenance bay Required for the diversion of Severn Trent Water Limited water pipeline Required for the diversion of Wales & West Utilities gas main | 4x, 15, 18 |
| 14/1d | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the construction of a service road to the south of the A4019 (Tewkesbury Road) serving properties including the Cotswold Area Civil Service Sports Association; Homecroft Drive and the West Cheltenham Community Fire Station Required for the diversion of Severn Trent Water Limited water pipeline for the benefit of Severn Trent Water Limited Required for the diversion of Wales & West Utilities Limited gas main Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 4v, 15, 18, 33 |
| 14/1h | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the diversion of Wales & West Utilities Limited gas main Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 18, 27 |
| 14/1i | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 27 |
| 14/1j | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the diversion of Wales & West Utilities Limited gas main Required for the diversion of telecommunication cable and associated apparatus and equipment | 4, 18, 27 |
| 14/1k | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| 14/1l | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting | 4 |
| 14/2a | Required for the construction of new or altered private means of access | 4g |
| 14/2b | Required for the construction of new or altered private means of access | 4g |
| 14/4a | Required for the alteration of the signalised junction serving Gallagher Retail Park and the B4634 to the south of the A4019 (Tewkesbury Road) with maintenance bay | 4x |
| 14/8d | Required for the realignment and dualling of the A4019 (Tewkesbury Road) southeast of Junction 10, M5 to east of Gallagher Junction with associated footway, cycleway, shared use paths, private means of access, signage and ducting Required for the diversion of Wales & West Utilities Limited gas main | 4, 18 |
| Land Plans – Sheet 15 | ||
| 15/1a | Required for construction compound no. 9 south of Junction 10 | 1p |
| 15/1b | Required for construction compound no. 9 south of Junction 10 | 1p |
| 15/2a | Required for the realignment of Withybridge Lane connecting to the realigned and dualled A4019 (Tewkesbury Road) | 4bb |
| 15/4d | Required for the construction of a new West Cheltenham Link Road | 5 |
| 15/4g | Required for the construction of a new West Cheltenham Link Road | 5 |
| 15/5c | Required for the construction of a new West Cheltenham Link Road | 5 |
| 15/5d | Required for the construction of a new West Cheltenham Link Road | 5 |
| 15/5d(i) | Required for the construction of a new West Cheltenham Link Road | 5 |
| 15/7b | Required for the construction of a new West Cheltenham Link Road | 5 |
| 15/8e | Required for working space for construction compound no. 7 east of the new West Cheltenham Link Road | 5g |
| 15/8e(i) | Required for working space for construction compound no. 7 east of the new West Cheltenham Link Road | 5g |
| 15/8f | Required for construction compound no. 7 east of the new West Cheltenham Link Road | 5g |
| 15/8g | Required for the construction of a new West Cheltenham Link Road | 5 |
| 15/8g(i) | Required for the construction of a new West Cheltenham Link Road | 5 |
| 15/8h | Required for construction compound no. 7 east of the new West Cheltenham Link Road | 5g |
| 15/8i | Required for the diversion, use, protection, inspection and maintenance of 170 metres of gas main for the benefit of Wales & West Utilities Limited | 35 |
| 15/8j | Required for the construction of a new West Cheltenham Link Road | 5 |
| 15/8o | Required for the diversion, use, protection, inspection and maintenance of 170 metres of gas main for the benefit of Wales & West Utilities Limited | 35 |
| 15/8q | Required for the construction of a new West Cheltenham Link Road | 5 |
| 15/8r | Required for construction compound no. 7 east of the new West Cheltenham Link Road Required for the construction of new or altered private means of access | 5g, 5k |
| 15/8s | Required for construction compound no. 7 east of the new West Cheltenham Link Road | 5g |
| 15/8t | Required for the construction of a new West Cheltenham Link Road Required for the construction, use, protection and maintenance of a new bridge over the River Chelt and associated environmental mitigation Required for the diversion, construction, use and maintenance of public right of way FP ABO24 to the south of the River Chelt under the new River Chelt bridge | 5, 5d, 5f |
| 15/10b | Required for the construction of a new West Cheltenham Link Road | 5 |
| 15/10c | Required for the construction of a new West Cheltenham Link Road | 5 |
| 15/10c(i) | Required for the construction of a new West Cheltenham Link Road | 5 |
| 15/10c(ii) | Required for the construction of a new West Cheltenham Link Road | 5 |
| Land Plans – Sheets 16 and 16A | ||
| 16/3b | Required for construction compound no. 8 west of the new West Cheltenham Link Road | 5h |
| 16/3b(i) | Required for the construction of a new West Cheltenham Link Road | 5 |
| 16/3f | Required for the construction of a new West Cheltenham Link Road | 5 |
| 16/3f(i) | Required for the construction of a new West Cheltenham Link Road | 5 |
| 16/3f(ii) | Required for the construction of a new West Cheltenham Link Road | 5 |
| 16/3g | Required for the provision of a flood compensation area | 6d |
| 16/3h | Required for construction compound no. 8 west of the new West Cheltenham Link Road | 5h |
| 16/3j | Required for construction compound no. 8 west of the new West Cheltenham Link Road | 5h |
| 16/3m | Required for the construction of a new West Cheltenham Link Road | 5 |
| 16/3n | Required for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting | 6 |
| 16/3n(i) | Required for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting | 6 |
| 16/3p | Required for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting | 6 |
| 16/3p(i) | Required for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting | 6 |
| 16/5b | Required for working space for the diversion of National Grid Electricity Distribution PLC electric cable and associated apparatus and equipment | 25 |
| 16/5e | Required for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage, and ducting Required for the diversion of Severn Trent Water Limited water pipeline Required for the diversion of National Grid Electricity Distribution PLC electric cable and associated apparatus and equipment | 6, 14, 25 |
| 16/6c | Required for the diversion of National Grid Electricity Distribution PLC electric cable and associated apparatus and equipment | 25 |
| 16/9b | Required for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting Required for the construction of flood culverts (group 1) under the B4634 Required for the construction of flood culverts (group 2) under the B4634 Required for the construction of new or altered private means of access | 6, 6a, 6b, 6c |
| 16/10b | Required for diversion of electric cable and associated apparatus and equipment | 26 |
| 16/10d | Required for the construction of a signalised junction serving the new West Cheltenham Link Road, the B4634, and the West Cheltenham Golden Valley Development land Required for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting Required for the construction of flood culverts (group 1) under the B4634 Required for the construction of flood culverts (group 2) under the B4634 | 5j, 6, 6a, 6b |
| 16/11b | Required for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting | 6 |
| 16/11b(i) | Required for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting | 6 |
| 16/11b(ii) | Required for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting | 6 |
| 16/12a | Required for the realignment of the B4634 connecting to the new West Cheltenham Link Road with shared use path, private access, signage and ducting | 6 |
Annotations
Commencement
- I1
Sch. 7 in force at 25.6.2025, see art. 1