OpenLegislation

The M74 Motorway (Fullarton Road to the M8 West of Kingston Bridge) (Speed Limit) Regulations 2012 in England

S.S.I. 2012/320 · Made 22 November 2012

Original text. legislation.gov.uk does not revise statutory instruments, so later amendments are not shown here. Changes made to it are listed under each provision when known.

Road Traffic

Made 22nd November 2012

Laid before the Scottish Parliament 23rd November 2012

Coming into force 28th December 2012

The Scottish Ministers make the following Regulations in exercise of the powers conferred by section 17(2), (3) and (3ZA) of the Road Traffic Regulation Act 1984f1 and all other powers enabling them to do so.

In accordance with section 17(3A)f2 of that Act they have consulted with such representative organisations as they think fit.

Annotations to the whole text

Footnotes

f1

1984 c.27. Section 17(2) was amended by the New Roads and Street Works Act 1991 (c.22), Schedule 8, paragraph 28; by the Road Traffic Act 1991 (c.40), Schedule 4, paragraph 25 and Schedule 8, paragraph 1; by the National Parks (Scotland) Act 2000 (asp 10), schedule 5, paragraph 11 and by the Scotland Act 2012 (c.11), section 21(3). Section 17(3ZA) was inserted by the Scotland Act 2012, section 21(4).

f2

Section 17(3A) was amended by the Scotland Act 2012, section 21(5).

Contents

  1. 1Citation and commencement
  2. 2Interpretation
  3. 3Speed limits
  4. 4Exemptions
  5. Signature
  6. Schedule
  7. Part 1: 60MPH SPEED LIMIT
  8. 1Paragraph 1
  9. 2Paragraph 2
  10. 3Paragraph 3
  11. 4Paragraph 4
  12. 5Paragraph 5
  13. 6Paragraph 6
  14. 7Paragraph 7
  15. 8Paragraph 8
  16. 9Paragraph 9
  17. Part 2: 50MPH SPEED LIMIT
  18. 10Paragraph 10
  19. Part 3: 30MPH SPEED LIMIT
  20. 11Paragraph 11
  21. 12Paragraph 12
  22. 13Paragraph 13
  23. 14Paragraph 14
  24. 15Paragraph 15
  25. Explanatory note

1Citation and commencement

These Regulations may be cited as the M74 Motorway (Fullarton Road to the M8 West of Kingston Bridge) (Speed Limit) Regulations 2012 and come into force on 28th December 2012.

2Interpretation

In these Regulations—

  • “the M8” means the M8/A8 Edinburgh - Greenock Trunk Road;

  • “the M74” means the M74/A74(M)/A74 Glasgow - Carlisle Trunk Road;

  • “point 1” means a point 32 metres or thereby east of the point of intersection of the centre lines of the M74 and Carmyle Avenue;

  • “point 2” means a point 710 metres or thereby southeast of the point of intersection of the centre lines of the M74 and Polmadie Road;

  • “point 3” means a point 60 metres or thereby northeast of the point of intersection of the centre lines of Scotland Street and West Street,

and references to “the Schedule” are to the Schedule to these Regulations.

3Speed limits

No person may drive a motor vehicle at a speed exceeding—

(a)

60 miles per hour on those lengths of road described in Part 1 of the Schedule;

(b)

50 miles per hour on those lengths of road described in Part 2 of the Schedule;

(c)

30 miles per hour on those lengths of road described in Part 3 of the Schedule.

4Exemptions

No speed limit imposed by these Regulations applies to vehicles falling within regulation 3(4) of the Road Traffic Exemptions (Special Forces) (Variation and Amendment) Regulations 2011f1 when used in accordance with regulation 3(5) of those Regulations.

Signature

KEITH BROWN

Authorised to sign by the Scottish Ministers

St Andrew’s House,

Edinburgh

22nd November 2012

1

That length of the carriageway of the M74 between point 1 and point 2, a distance of 4.9 kilometres or thereby.

2

That length of the M74 being part of the eastbound on-slip road from Fullarton Road, from a point 26 metres or thereby east of the east kerb line of the Fullarton Road roundabout (as measured along the northernmost kerb line of the on-slip road), eastwards to its junction with the main eastbound carriageway of the M74, a distance of 507 metres or thereby.

3

That length of the M74 being part of the westbound on-slip road from Fullarton Road, from a point 34 metres or thereby west of the west kerb line of the Fullarton Road roundabout (as measured along the southernmost kerb line of the on-slip road), westwards to its junction with the main westbound carriageway of the M74, a distance of 537 metres or thereby.

4

That length of the M74 being part of the eastbound off-slip road to Fullarton Road, from its junction with the main eastbound carriageway of the M74, eastwards to a point 239 metres or thereby from that junction (as measured along the northernmost kerb line of the off-slip road).

5

That length of the M74 being part of the westbound off-slip road to Fullarton Road, from its junction with the main westbound carriageway of the M74, westwards to a point 237 metres or thereby from that junction (as measured along the southernmost kerb line of the off-slip road).

6

That length of the M74 being part of the eastbound on-slip road from Cambuslang Road, from a point 93 metres or thereby east of the north east kerb line of Cambuslang Road (as measured along the northernmost kerb line of the on-slip road), eastwards to its junction with the main eastbound carriageway of the M74, a distance of 572 metres or thereby.

7

That length of the M74 being part of the westbound on-slip road from Cambuslang Road, from a point 103 metres or thereby west of the south west kerb line of Cambuslang Road (as measured along the southernmost kerb line of the on-slip road), westwards to its junction with the main westbound carriageway of the M74, a distance of 600 metres or thereby.

8

That length of the M74 being part of the eastbound off-slip road to Cambuslang Road, from its junction with the main eastbound carriageway of the M74, eastwards to a point 270 metres or thereby from that junction (as measured along the northernmost kerb line of the off-slip road).

9

That length of the M74 being part of the westbound off-slip road to Cambuslang Road, from its junction with the main westbound carriageway of the M74, westwards to a point 247 metres or thereby from that junction (as measured along the southernmost kerb line of the off-slip road).

10

That length of the M74 being part of the westbound off-slip road to Carnoustie Street, from its junction with the main westbound carriageway of the M74, westwards to a point 111 metres or thereby from that junction (as measured along the northernmost kerb line of the off-slip road).

11

That length of the M74 being part of the eastbound off-slip road to Polmadie Road, from a point 245 metres or thereby from its junction with the main eastbound carriageway of the M74 (as measured along the northernmost kerb line of the off-slip road), eastwards to the west kerb line of Polmadie Road, a distance of 283 metres or thereby.

12

That length of the M74 being part of the westbound off-slip road to Polmadie Road, from a point 263 metres or thereby from its junction with the main westbound carriageway of the M74 (as measured along the southernmost kerb line of the off-slip road), westwards to the east kerb line of Polmadie Road, a distance of 236 metres or thereby.

13

That length of the M74 being part of the eastbound on-slip road from Dalintober Street, from a point 65 metres or thereby south of the intersection of the centre lines of Dalintober Street and Wallace Street to a point 166 metres or thereby southeast of that intersection, a distance of 101 metres or thereby.

14

That length of the M74 being the eastbound off-slip road to Paisley Road, from a point 127 metres or thereby from its junction with the eastbound carriageway of the M74 (as measured along the northernmost kerb line of the on-slip road), north eastwards to the south kerb line of Paisley Road, a distance of 349 metres or thereby.

15

That length of the M74 being the westbound off-slip road to Carnoustie Street, from a point 111 metres or thereby from the junction of the main westbound carriageway of the M74 (as measured along the northernmost kerb line of the on-slip road), westwards to the east kerb line of Carnoustie Street, a distance of 232 metres or thereby.

Explanatory note

(This note is not part of the Regulations)

These Regulations apply permanent speed limits to the M74 motorway between Fullarton Road, Glasgow and its connection to the M8 motorway west of the Kingston Bridge. Speed limits are applied to the main carriageway and slip roads.

Regulation 3 and Part 1 of the Schedule set the maximum speed limit for the driving of motor vehicles at 60 miles per hour on certain lengths of road.

Regulation 3 and Part 2 of the Schedule set the maximum speed limit for the driving of motor vehicles at 50 miles per hour on certain lengths of road.

Regulation 3 and Part 3 of the Schedule set the maximum speed limit for the driving of motor vehicles at 30 miles per hour on certain lengths of road.

Regulation 4 provides that the speed limits do not apply to vehicles used for naval, military or air force purposes while being driven in response, or for practice in responding, to a national security emergency by a member of the special forces who has been trained in driving at high speeds or for the purpose of such training.

The Regulations come into force on 28th December 2012. Prior to that date, temporary speed limits applied to the roads covered by these Regulations, by virtue of the M74 Motorway (Fullarton Road to the M8 Motorway West of Kingston Bridge) (Temporary Speed Restriction) Order 2011 (S.S.I. 2011/275).