OpenLegislation

Regulation 14 Suppliers: plan to identify and monitor production process

England and Wales

(1)

A supplier involved in the production of plant material must have in place a plan to identify and monitor critical points in the production of that plant material.

(2)

The plan must include details on—

(a)

the location and number of plants;

(b)

the timing of cultivation;

(c)

propagating operations;

(d)

packaging, storage and transportation operations.