Regulation 14 Suppliers: plan to identify and monitor production processI1
England and Wales
(1)
A supplier involved in the production of plant material must have in place a plan to identify and monitor critical points in the production of that plant material.
(2)
The plan must include details on—
(a)
the location and number of plants;
(b)
the timing of cultivation;
(c)
propagating operations;
(d)
packaging, storage and transportation operations.
Annotations
Commencement
- I1
Reg. 14 in force at 19.6.2017, see reg. 1(1)