Article 3 Development consent etc. granted by the OrderI1
England, Wales and Scotland
The undertaker is granted development consent for the authorised development, as set out in Schedule 1 (authorised development), subject to the provisions of this Order including the requirements set out in Schedule 2 (requirements).
Subject to paragraph (3), each numbered work must be situated on the corresponding numbered area shown on the works plans.
In constructing each numbered work, the undertaker may deviate within the corresponding numbered area shown on the works plans up to the limits of deviation.
Development consent is only granted for development within the Order limits.
Annotations
Commencement
- I1
Art. 3 in force at 2.8.2016, see art. 1
Notes on the whole SI
Textual amendments
- F1
Words in Preamble substituted (22.11.2016) by The Meaford Gas Fired Generating Station (Correction) Order 2016 (S.I. 2016/1046), arts. 1, 2, Sch.