Paragraph 16 Bridge plinthsI1
England, Wales and Scotland
No pipeline support plinths forming numbered work 2B(b)(vi) must be installed on canal bridge 101 (Malkin’s Bridge) as marked on the works plans.
The crown of the pipeline over canal bridge 101 must not protrude above the repaired parapet by more than 150mm in height.
Numbered work 2B(c) may not commence until a method statement detailing the extent and nature of the repairs for the parapet of Canal Bridge 101 (Malkin’s Bridge) has been submitted to and approved by the relevant planning authority.
Annotations
Commencement
- I1
Sch. 2 para. 16 in force at 2.8.2016, see art. 1
Notes on the whole SI
Textual amendments
- F1
Words in Preamble substituted (22.11.2016) by The Meaford Gas Fired Generating Station (Correction) Order 2016 (S.I. 2016/1046), arts. 1, 2, Sch.