Regulation 4 Pattern approval and initial verification: the EEC signs and marksF1I1C1
United Kingdom
The EEC signs and marks referred to in these Regulations are the signs and marks described in Schedule 1 to these Regulations, which relate to EEC pattern approval and EEC initial verification.
In these Regulations, references to an EEC sign or mark of a description mentioned in column 1 below are references to the sign or mark described in the paragraph of Schedule 1 to these Regulations specified in column 2 below in relation to that sign or mark.
In these Regulations, references to the United Kingdom version of a sign or mark mentioned in column 1 of paragraph (2) above are references–
to the sign or mark appropriate, in accordance with the provisions of Schedule 1 to these Regulations, for an EEC pattern approval granted or (as the case may be) an EEC initial verification carried out in the United Kingdom; or
in the case of the sign of exemption from EEC pattern approval, to the sign appropriate, in accordance with paragraph 3 of that Schedule, for an instrument constructed in the United Kingdom and exempt from EEC pattern approval.
Annotations
Textual amendments
- F1
Regulations revoked with savings (1.12.2015) by The Weights and Measures (Revocations) Regulations 2015 (S.I. 2015/356), reg. 1(2)(b), Sch. Pt. 2 para. 3 (with Sch. Pt. 2 para. 5 (as amended on IP completion day by S.I. 2019/696, reg. 1, Sch. 17 para. 1(3)))
Modifications
- C1
Reg. 4 applied (with modifications) (1.11.1995) by The Measuring Instruments (EC Requirements) (Electrical Energy Meters) Regulations 1995 (S.I. 1995/2607), regs. 1(1), 5