Paragraph 4 Deposit of sample instrumentF1I1
United Kingdom
Without prejudice to paragraph 2(3) above, if the relevant Directive requires a sample instrument to be supplied for retention by the metrological service considering an application for EEC pattern approval, the Secretary of State may, on granting an EEC pattern approval under these Regulations, either–
retain any instrument supplied as a sample instrument of the pattern in question; or
require instead the deposit of parts of an instrument of that pattern, or of scale models or drawings of such an instrument.
If the Secretary of State requires the deposit of parts of an instrument or of scale models or drawings instead of retaining a sample instrument he shall include a statement to that effect in the certificate of pattern approval.
Annotations
Textual amendments
- F1
Regulations revoked with savings (1.12.2015) by The Weights and Measures (Revocations) Regulations 2015 (S.I. 2015/356), reg. 1(2)(b), Sch. Pt. 2 para. 3 (with Sch. Pt. 2 para. 5 (as amended on IP completion day by S.I. 2019/696, reg. 1, Sch. 17 para. 1(3)))
Commencement
- I1
Sch. 2 para. 4 in force at 14.3.1988, see reg. 1(1)
Notes on Schedule 2
Modifications
- C1
Sch. 2 applied (with modifications) (21.10.1993) by The Clinical Thermometers (EEC Requirements) Regulations 1993 (S.I. 1993/2360), regs. 1, 7 (with reg. 3)
- C2
Sch. 2 applied (with modifications) (1.11.1995) by The Measuring Instruments (EC Requirements) (Electrical Energy Meters) Regulations 1995 (S.I. 1995/2607), regs. 1(1), 5