Paragraph 5 EEC initial verification of material measures of lengthF1I1
United Kingdom
Where material measures of length are manufactured in series, and the applicant states that they have already been adequately inspected, he may request the inspector to whom the application is made for measures to be considered for EEC initial verification to carry out the examination by making a statistical check by attributes on lots composed of measures subject to the conditions set out in points 11.1 and 11.2 of the Directive on material measures of length.
Annotations
Textual amendments
- F1
Regulations revoked with savings (1.12.2015) by The Weights and Measures (Revocations) Regulations 2015 (S.I. 2015/356), reg. 1(2)(b), Sch. Pt. 2 para. 3 (with Sch. Pt. 2 para. 5 (as amended on IP completion day by S.I. 2019/696, reg. 1, Sch. 17 para. 1(3)))
Commencement
- I1
Sch. 3 para. 5 in force at 14.3.1988, see reg. 1(1)