Regulation 39 Conformity assessment proceduresE1
England, Wales and Scotland
Conformity assessment of a F1regulated measuring instrument with the essential requirements must be established by the application at the choice of the manufacturer, of one of the conformity assessment procedures listed as applicable in relation to the regulated measuring instrument in Schedule F21C to 1J.
F3An approved body must carry out the conformity assessment procedure selected by the manufacturer in accordance with the requirements of Schedule 4.
The documents and correspondence relating to the conformity assessment procedures referred to in this regulation which are carried out in the United Kingdom must be drawn up in English.
Annotations
Textual amendments
- F1
Word in reg. 39(1) inserted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 23(a)(i) (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Words in reg. 39(1) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 23(a)(ii) (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F3
Words in reg. 39(2) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 23(b) (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
Extent
- E1
This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only