OpenLegislation

Regulation 49 Responsibility of manufacturer that draws up declaration of conformityE1

England, Wales and Scotland

A manufacturer, who draws up F1a declaration of conformity in relation to a F2regulated measuring instrument, is responsible for compliance of the measuring instrument with the requirements of these Regulations.

Annotations

Textual amendments

F1

Word in reg. 49 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 34(a) (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)

F2

Word in reg. 49 inserted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 34(b) (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)

Extent

E1

This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only

Notes on Chapter 3

Textual amendments

F1

Word in Pt. 4 Ch. 3 heading omitted (E.W.S.) (31.12.2020) by virtue of The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 30 (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)