OpenLegislation

Schedule 1 ESSENTIAL REQUIREMENTS AND APPLICABLE CONFORMITY ASSESSMENT PROCEDURESF1

  1. 1Introductory
  2. 2Water Meters
  3. 3Gas meters
  4. 4Volume conversion devices
  5. 5Active electrical energy meters
  6. 6Thermal Energy Meters
  7. 7Non-water liquid measuring systems
  8. 8Automatic weighing instruments
  9. 9Taximeters
  10. 10Material measures of length
  11. 11Capacity serving measures
  12. 12Dimensional measuring instruments
  13. 13Exhaust gas analysers

Annotations

Textual amendments

F1

Sch. 1 omitted (E.W.S.) (31.12.2020) by virtue of The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 48 (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)