Provision changed Change By In force Text
Pt. 1 applied (with modifications) art. 30 13 Mar 2024 Written in
s. 11(3) restricted Sch. 9 para. 95(1) 13 Mar 2024 Written in
s. 10 applied art. 28(4) 13 Mar 2024 Written in
s. 7 applied art. 28(4) 13 Mar 2024 Written in
Sch. 2A excluded art. 26(3) 13 Mar 2024 Written in
Pt. 1 applied (with modifications) Sch. 9 para. 4 5 13 Mar 2024 Written in
s. 13 applied art. 19(7) 20(11) 32(10) 13 Mar 2024 Written in