OpenLegislation

Regulation 12 Ballast water exchange standardI1

United Kingdom

(1)

Where the sequential method of ballast water exchange is used, it must achieve 95 per cent volumetric exchange of ballast water.

(2)

Where the pump-through method of ballast water exchange is used—

(a)

at least three times the volume of the ballast water tank must be pumped through that tank; or

(b)

it must achieve 95 per cent volumetric exchange of ballast water.

Annotations

Commencement

I1

Reg. 12 in force at 29.7.2022, see reg. 1(1)