Additional requirements for a ship constructed on or after 1st October 1994 Additional requirements for a ship constructed on or after 1st October 1994F1
United Kingdom Repealed
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- 55Bulkheads within a main vertical zone
- 56Fire Integrity of bulkheads and decks
- 57Protection of stairways and lifts in accommodation and service spaces
- 58Openings in “A” Class divisions
- 59Openings in “B” Class divisions
- 60Ventilation systems
Annotations
Textual amendments
- F1
Regulations revoked (15.6.2023) by The Merchant Shipping (Fire Protection) Regulations 2023 (S.I. 2023/568), reg. 1(1), Sch. 1 Pt. 2 (with reg. 5)
[Editorial note: No historical revised versions have been created for amendments to this S.I. made prior to its final revocation. A revised version of how the S.I. stood at its first commencement is available and, to see the document content as it originally stood when it was made, select the 'Original (As Made)' version. For further details of the amendments see the List of All Changes available in 'More Resources']