OpenLegislation

Regulation 7 Requirement for Sewage Certificate: initial surveyI1

United Kingdom Not yet in force

Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:

(1)

A ship to which this regulation applies must not—

(a)

be put into service, or

(b)

(if it is already in service) continue in service,

unless the requirements set out in paragraph (2) are met.

(2)

The requirements are that—

(a)

a survey has been carried out in respect of the ship,

(b)

at the date of the survey the surveyor is satisfied that the structure, equipment, systems, fittings, arrangements and materials of the ship fully comply with the requirements of Part 3, and

(c)

a Sewage Certificate has been issued in respect of that ship and is still valid.

(3)

A survey carried out under paragraph (2) is referred to in these Regulations as an “initial survey”.

Annotations

Commencement

I1

Reg. 7 in force at 1.2.2009, see reg. 1(2)