Construction and Initial Testing of Watertight Bulkheads, &c. Construction and Initial Testing of Watertight Bulkheads, &c.
United Kingdom
- (1)
Watertight subdivision bulkheads, whether transverse or longitudinal, shall be constructed in such a manner that they shall be capable of supporting with a proper margin of resistance, the pressure due to a head of water up to the margin line in way of each bulkhead. The construction of these bulkheads shall be to the satisfaction of the Administration.
- (2)
Steps and recesses in bulkheads shall be watertight and as strong as the bulkhead at the place where each occurs.
Where frames or beams pass through a watertight deck or bulkhead, such deck or bulkhead shall be made structurally watertight without the use of wood or cement.
- (3)
Testing main compartments by filling them with water is not compulsory. A complete examination of the bulkheads shall be made by a surveyor; and, in addition, a hose test shall be made in all cases.
- (4)
The fore peak shall be tested with water to a head up to the deepest subdivision loadline.
- (5)
Double bottoms, including duct keels, and inner skins are to be subjected to a head of water up to the margin line.
- (6)
Tanks which are intended to hold liquids, and which form part of the subdivision of the ship, shall be tested for tightness with water to a head up to the deepest subdivision loadline or to a head corresponding to two-thirds of the depth from the top of keel to the margin line in way of the tanks whichever is the greater; provided that in no case shall the test head be less than 3 feet (.92 metre) above the top of the tank.
Notes on Schedule FIRST
Textual amendments
- F1
Sch. 1 repealed (1.1.1996) by 1995 c. 21, ss. 314(1), 316(2), Sch. 12 (with s. 312(1), Sch. 14 para. 1)