Regulation 4 Application for approvalI1
England, Wales and Scotland
Any person who requires the pattern or construction of a meter or its manner of installation to be approved shall submit to the Director—
an application containing the information specified in the Schedule and signed by that person; F1...
not less than three meters of the pattern or construction and containing the components described in the application F2; and
where a report has been obtained in support of the application from a nominated laboratory, a certified test report.
References in this regulation to the pattern or construction of a meter or to the manner of its installation include references to a modification of a pattern or construction or of a manner of installation which has previously been approved in accordance with these Regulations.
Annotations
Textual amendments
- F1
Word in reg. 4(1)(a) omitted (1.2.2003) by virtue of The Electricity (Approval of Pattern or Construction and Installation and Certification) (Amendment) Regulations 2002 (S.I. 2002/3129), reg. 1(1), Sch. para. 2(2) (with reg. 3)
- F2
Reg. 4(1)(c) and word inserted (1.2.2003) by The Electricity (Approval of Pattern or Construction and Installation and Certification) (Amendment) Regulations 2002 (S.I. 2002/3129), reg. 1(1), Sch. para. 2(3) (with reg. 3)