OpenLegislation

Paragraph 5 Conditions for testing

Original text. Later amendments are not shown.

(1)

The tests shall be carried out in accordance with Table 1.

Meter position

(2)

Meter position requirements given in Table 1 apply to induction meters only. Tolerance applies to vertical wall on which meter base is mounted and a horizontal reference line or edge on the meter e.g. lower edge of terminal block.

Voltage and current supplies for polyphase meters

(3)
(a)

The order of the phases shall correspond to the sequence shown on the connection diagram.

(b)

The voltages shall be balanced so that the voltage between any line and neutral or between any two lines shall not differ by more than 1.5% from the mean of the corresponding voltages.

(c)

The currents shall be balanced so that the currents in the conductors shall not differ by more than 2.5% from the mean of these currents.

(d)

The phase displacement between the current and corresponding phase to neutral voltage shall not differ from other current and voltage phase displacements by more than 3° at any power factor under any specified load conditions.

External magnetic induction

(4)

The test given in Table 1 in respect of external magnetic induction shall be carried out during commissioning or after major modification or refurbishing of a meter testing system. The tests consists of determining the errors at 0.1Ib unity power factor with the meters normally connected and then determining the errors for–

(a)

single phase meters after reversing both current and voltage connections for which half the difference between the two errors is the value of the variation.

(b)

polyphase meters by making two additional measurements after each of the connections to the current circuits and to the voltage circuits are changed over 120° but with the phase sequence unaltered for which the greatest difference between each error determined and the mean of the three errors is the value of the variation.

Dial tests

(5)

Where all the errors of repaired meters are determined by Method B or Method C test, an additional test in accordance with Method A shall be carried out. The Method A test shall be carried out at one of the loads used for the Method B or Method C test and the error obtained by the Method A test shall not differ by more than 0.6% from the error obtained for this load by the Method B or Method C test.

Duration of test

(6)

For any of the above methods of test, the duration of the test shall continue until the error of meters can be calculated within a tolerance not greater than ±0.2%.

Conditions for mixing methods of test

(7)

Method A tests may be used for intermediate and high loads, at unity and 0.5 power factor, and Method B or Method C tests for the low load, provided that an additional Method B or Method C test is carried out at one of the test load values used for the Method A tests.