OpenLegislation

Paragraph 6 Test loads

Original text. Later amendments are not shown.

(1)

Every repaired meter shall be tested at each of the loads specified in Table 2.

(2)

All new meters shall be calibrated and tested at a sufficient number of load points so as to ensure that meter errors are not greater than the limits specified in paragraph 9.

(3)

A test will also be carried out on new meters for starting in accordance with Test No 7 of Table 2.

(4)

The ratio accuracy shall be determined for voltage transformers that are intended for use with meters but are not tested with a meter.

(5)

Current transformers intended for use with meters but not tested with a meter shall be tested from 5% to 100% of rated current.