Paragraph 4 Methods of accuracy testI1

England, Wales and Scotland

The tests in table 2 shall be carried out by one of the following methods—

  • Method A test

    1. (1)

      A long period dial test where the advance of a kWh display, which is part of or connected to a meter under test, is compared with the advance of a precision kilowatt-hour meter;

  • Method B test

    1. (2)

      A short period test where the rate of advance of a meter under test is compared to the rate of advance of a precision kilowatt-hour meter; or

  • Method C test

    1. (3)

      A short period test where the actual rate of advance of a meter, when tested under constant power conditions over a specified test period, is compared to the calculated rate of advance for those conditions.