Paragraph 4 Methods of accuracy testI1
England, Wales and Scotland
The tests in table 2 shall be carried out by one of the following methods—
Method A test
- (1)
A long period dial test where the advance of a kWh display, which is part of or connected to a meter under test, is compared with the advance of a precision kilowatt-hour meter;
- (1)
Method B test
- (2)
A short period test where the rate of advance of a meter under test is compared to the rate of advance of a precision kilowatt-hour meter; or
- (2)
Method C test
- (3)
A short period test where the actual rate of advance of a meter, when tested under constant power conditions over a specified test period, is compared to the calculated rate of advance for those conditions.
- (3)
Annotations
Commencement
- I1
Sch. 1 para. 4 in force at 1.8.1998, see reg. 1