OpenLegislation

Paragraph 4 Methods of accuracy testI1

Northern Ireland

Method A test

(1)

A long period dial test where the advance of a kWh display, which is part of or connected to a meter under test, is compared with the advance of a precision kilowatt-hour meter.

Method B test

(2)

A short period test where the rate of advance of a meter under test is compared to the rate of advance of a precision kilowatt-hour meter.

Method C test

(3)

A short period test where the actual rate of advance of a meter when tested under constant power conditions over a specified test period, is compared to the calculated rate of advance for those conditions.

Annotations

Commencement

I1

Sch. 1 para. 4 in operation at 1.2.1999, see reg. 1