Works as shown on Sheets 12 to 15 (inclusive) of the work plans to construct and install a new underground transmission electric line (5.5 kilometres in length) in the section of the works between and including the Dedham Vale East Cable Sealing End Compound and the Dedham Vale West Cable Sealing End Compound, including—

(a)

the installation of 5.5 kilometres of underground transmission electric line, including cable ducts, joint bays, link pillars, fibre optic earthwire conductors and earthing and protection and control systems, to facilitate a connection between the Dedham Vale East Cable Sealing End Compound and the Dedham Vale West Cable Sealing End Compound;

(b)

Dedham Vale East Sealing End Compound sealing end equipment including switchgear and connection to overhead transmission electric line conductors including gantries;

(c)

Dedham Vale West Sealing End Compound sealing end equipment including switchgear and connection to overhead transmission electric line conductors including gantries;

(d)

Dedham Vale East Cable Sealing End Compound permanent compound, security fencing and gates, within which is situated the sealing end equipment, earthing and protection and control systems, portable relay room, supervisory control and data acquisition communication, switchgear, connection to overhead electric line including fibre optic cable to joint boxes, gantries, transformers, cables, surface troughs, fibre optic cable and joint boxes;

(e)

Dedham Vale West Cable Sealing End Compound permanent compound, security fencing and gates, within which is situated the sealing end equipment, earthing and protection and control systems, portable relay room, supervisory control and data acquisition communication, switchgear, connection to overhead electric line including fibre optic cable to joint boxes, gantries, transformers, cables, surface troughs, fibre optic cable and joint boxes;

(f)

permanent vehicular access road(s), hardstanding, drainage (including attenuation ponds), and site services, including power supply, for each of the Dedham Vale East Sealing End Compound and the Dedham Vale West Sealing End Compound; and

(g)

landscaping, including mitigation planting at each of the Dedham Vale East Sealing End Compound and the Dedham Vale West Sealing End Compound.