OpenLegislation

In the District of Braintree In the District of Braintree

England and Wales

Works as shown on Sheets 27 and 28 of the work plans to realign the existing overhead transmission electric line (Route 4YLA) between the two sealing end compound gantries at the Stour Valley West Cable Sealing End Compound and a point indicated as 4YLA007 (Route 4YLA), including—

(a)

the modification of existing pylon 4YLA007;

(b)

the foundations and steelwork to construct new pylon 4YLA006C;

(c)

the installation of 0.6 kilometres of overhead transmission electric line between the two sealing end compound gantries at the Stour Valley West Cable Sealing End Compound and a point indicated as 4YLA007 on Sheet 28 of the Work Plans;

(d)

the installation of conductors, insulators and fittings, including downleads and downdroppers at each gantry to facilitate connection to the equipment within the Stour Valley West Cable Sealing End Compound; and

(e)

the installation of fibre optic earthwire conductors, with optical fibres terminated in joint boxes.

Notes on Schedule 1

Commencement

I1

Sch. 1 in force at 4.10.2024, see art. 1