In the Districts of Babergh and Braintree In the Districts of Babergh and Braintree
England and Wales
Works as shown on Sheets 19, 20, 21, 27 and 28 of the work plans to construct and install a new underground transmission electric line (5.1 kilometres in length) in the section of the works between and including the Stour Valley East Cable Sealing End Compound and the Stour Valley West Cable Sealing End Compound, including—
the installation of 5.1 kilometres of underground transmission electric line, including cable ducts, joint bays, link pillars, fibre optic earthwire conductors and earthing and protection and control systems, to facilitate a connection between the Stour Valley East Cable Sealing End Compound and the Stour Valley West Cable Sealing End Compound;
Stour Valley East Cable Sealing End Compound sealing end equipment including switchgear and connection to overhead transmission electric line conductors including gantries;
Stour Valley West Cable Sealing End Compound sealing end equipment including switchgear and connection to overhead transmission electric line conductors including gantries;
Stour Valley East Cable Sealing End Compound permanent compound, security fencing and gates, within which is situated the sealing end equipment, earthing and protection and control systems, portable relay room, supervisory control and data acquisition communication, switchgear, connection to overhead electric line including fibre optic cable to joint boxes, gantries, transformers, cables, surface troughs, fibre optic cable and joint boxes;
Stour Valley West Cable Sealing End Compound permanent compound, security fencing and gates, within which is situated the sealing end equipment, earthing and protection and control systems, portable relay room, supervisory control and data acquisition communication, switchgear, connection to overhead electric line including fibre optic cable to joint boxes, gantries, transformers, cables, surface troughs, fibre optic cable and joint boxes;
permanent vehicular access road(s), hardstanding, drainage (including attenuation ponds), and site services, including power supply, for each of the Stour Valley East Cable Sealing End Compound and the Stour Valley West Cable Sealing End Compound; and
landscaping, including mitigation planting at each of the Stour Valley East Cable Sealing End Compound and the Stour Valley West Cable Sealing End Compound.