In the Districts of Mid-Suffolk and Babergh In the Districts of Mid-Suffolk and Babergh
England and Wales
Works as shown on Sheets 1, 2, 3, 6 and 8 of the work plans to modify and reconfigure the existing overhead transmission electric line (Route 4YL) from and within Bramford Substation to existing pylon 4YL019 (including transpositions to the north and south of Hintlesham Woods), including—
the dismantling and removal of all existing overhead transmission electric line and pylons including foundations between the existing Bramford Substation gantries and a point indicated as 4YL004A on Sheet 1 of the work plans (and including the existing pylon 4YL004);
the dismantling and removal of all existing overhead transmission electric line and pylons including foundations between a point indicated as 4YL012A on Sheet 3 of the work plans and a point indicated as RB11 on Sheet 3 of the work plans (and including the existing pylon 4YL012);
the dismantling and removal of all existing overhead transmission electric line and pylons including foundations between a point indicated as 4YL018A on Sheet 8 of the work plans and a point indicated as RB16 on Sheet 8 of the work plans (and including the existing pylon 4YL018);
the realignment of the existing Bramford Substation gantries;
the foundations and steelwork to construct new pylons;
the installation of 0.5 kilometres of overhead transmission electric line between the realigned Bramford Substation gantries and a point indicated as new pylon 4YL004A on Sheet 1 of the work plans;
the installation of 2.6 kilometres of overhead transmission electric line between a point indicated as 4YL012A on Sheet 3 of the work plans and a point indicated as 4YL018A on Sheet 8 of the work plans;
the installation of conductors, busbars, switchgear and fittings, including downleads and downdroppers at each realigned gantry, to facilitate connection from the equipment within the gas insulated switchgear building situated within Bramford Substation to a point indicated as new pylon 4YL003C on Sheet 1 of the work plans;
the installation of fibre optic earthwire conductors, with optical fibres terminated in a joint box at a point indicated as new pylon 4YL003C on Sheet 1 of the work plans;
the temporary diversion of the existing overhead transmission electric line to facilitate the works; and
modifications to the existing overhead transmission electric line between a point indicated as 4YL004A on Sheet 1 of the work plans and a point indicated as 4YL007 on Sheet 2 of the work plans, between a point indicated as 4YL011 on Sheet 3 of the work plans and a point indicated as 4YL012A on Sheet 3 of the work plans and between a point indicated as 4YL018A on Sheet 8 of the work plans and a point indicated as 4YL019 on Sheet 8 of the work plans.