Schedule 10 LAND OF WHICH ONLY TEMPORARY POSSESSION MAY BE TAKENI1
England and Wales
| (1) Plot number of land shown on Land Plan | (2) Purpose for which temporary possession may be taken | (3) Relevant part of the authorised development | (4) Element of Work in respect of which land is not required to be reinstated |
| 1-05 | Temporary use for access | Work No. 1 and Work No. 2 | |
| 1-07, 1-09, 1-15, 1-21, 1-23, 1-24, 1-25, 1-27 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 1-07 – removal of pylon foundations only to a depth of 1.5m 1-09 – planting 1-21 – removal of pylon foundations only to a depth of 1.5m 1-15 – planting |
| 2-03 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | |
| 2-11, 2-24, 2-35, 2-36, 2-38, 2-39, 2-42, 2-44 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 2-24 – planting 2-38 – planting 2-42 – planting 2-44 – planting |
| 3-03, 3-07, 3-08 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 3-08 – planting |
| 3-01, 3-02 | Temporary use for access | Work No. 1 and Work No. 2 | |
| 3-11, 3-12, 3-51, 3-52, 3-53, 3-55, 3-57, 3-58, 3-60, 3-62, 3-63, 3-64, 3-67, 3-68, 3-69, 3-70, 3-71, 3-73, 3-74, 3-78, 3-80, 3-81, 3-82, 3-83, 3-87, 3-88, 3-96, 3-99, 3-106, 3-108, 3-109, 3-110, 3-111, 3-112, 3-113, 3-115 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No 1 and Work No. 2 | 3-11 – planting 3-12 – planting 3-51 – planting 3-53 – planting 3-55 – planting 3-57 – planting 3-62 – planting 3-63 – planting 3-64 – planting 3-68 – planting 3-73 – planting 3-74 – planting 3-82 – planting 3-83 – planting |
| 4-01, 4-02 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | |
| 4-03, 4-04, 4-05 | Temporary use for access | Work No. 8 | |
| 4-06 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | |
| 4-07 | Temporary use for access | Work No. 8 | |
| 4-08, 4-09, 4-10, 4-11, 4-13 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 4-09 – removal of pylon foundations only to a depth of 1.5m |
| 4-16 | Temporary use for access | Work No. 8 | |
| 4-17, 4-18 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | |
| 4-24 | Temporary use for access | Work No. 8 | |
| 4-25, 4-26, 4-27, 4-28 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 4-25 – removal of pylon foundations only to a depth of 1.5m 4-27 – removal of pylon foundations only to a depth of 1.5m |
| 4-29 | Temporary use for access | Work No. 8 | |
| 4-30, 4-31, 4-33, 4-34, 4-36, 4-37, 4-39, 4-40 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 4-31 – removal of pylon foundations only to a depth of 1.5m 4-40 – removal of pylon foundations only to a depth of 1.5m |
| 5-01, 5-02 | Temporary use for access | Work No. 8 | |
| 5-03, 5-04, 5-05, 5-06, 5-07 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 5-06 – removal of pylon foundations only to a depth of 1.5m |
| 5-08, 5-09, 5-10, 5-11 | Temporary use for access | Work No. 8 | |
| 5-12, 5-14, 5-15, 5-16, 5-19 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 5-15 – removal of pylon foundations only to a depth of 1.5m |
| 5-20 | Temporary use for access | Work No. 8 | |
| 6-06, 6-10, 6-21, 6-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 6-06 – planting 6-10 – planting 6-21 – planting |
| 6-22, 6-23 | Temporary use for access | Work No. 1 and Work No. 2 | |
| 6-25, | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 6-25 – planting |
| 6-29, 6-30, 6-31, 6-32, 6-33, 6-35 | Temporary use for access | Work No. 1 and Work No. 2 | |
| 6-41, 6-43 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 6-41 – planting 6-43 – planting |
| 6-45, 6-46, 6-47, 6-50 | Temporary use for access | Work No. 1 and Work No. 2 | |
| 7-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 7-01 – removal of pylon foundations only to a depth of 1.5m |
| 7-02, 7-03, 7-04, 7-05, 7-06, 7-07, 7-08 | Temporary use for access | Work No. 8 | |
| 7-09 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 7-09 – removal of pylon foundations only to a depth of 1.5m |
| 7-10, 7-11 | Temporary use for access | Work No. 8 | |
| 7-12, 7-13 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | |
| 7-14 | Temporary use for access | Work No. 8 | |
| 7-15 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 7-15 – removal of pylon foundations only to a depth of 1.5m |
| 7-16, 7-17 | Temporary use for access | Work No. 8 | |
| 7-19, 7-20, 7-21, 7-22, 7-23, 7-24, 7-25, 7-27, 7-28, 7-29, 7-30, 7-31, 7-32, 7-33, 7-34, 7-35, 7-37, 7-38, 7-39, 7-40, 7-41, 7-43, 7-44, 7-45, 7-46, 7-47, 7-49, 7-50, | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 7-50 – removal of pylon foundations only to a depth of 1.5m |
| 8-03, 8-04, 8-05 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 8-03 – planting |
| 8-06, 8-07, 8-08, 8-09, 8-10, 8-11 | Temporary use for access | Work No. 8 | |
| 8-12, 8-14, 8-15, 8-16, 8-18, 8-19, 8-23, 8-25, 8-29, 8-33, 8-34, 8-38, 8-39, 8-53, 8-55, 8-57, 8-58, 8-59, 8-60, 8-61, 8-62, 8-66, 8-73, 8-74, 8-88, 8-96, 8-100, 8-104, 8-113, 8-114, 8-118, 8-119, 8-120, 8-126, 8-128 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 and Work No. 8 | 8-12 – removal of pylon foundations only to a depth of 1.5m 8-15 – planting 8-53 – planting 8-57 – removal of pylon foundations only to a depth of 1.5m 8-66 – planting 8-74 – planting 8-100 – planting 8-118 – planting |
| 9-09 | Temporary use for access | Work No. 2 and Work No. 8 | |
| 9-11, 9-14 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 | |
| 9-12, 9-15, 9-19, 9-21, 9-23, 9-27, 9-28 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 | |
| 10-17 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 | 10-17 – planting |
| 10-21 | Temporary use for access | Work No. 2 and Work No. 8 | |
| 10-30 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 | 10-30 – planting |
| 11-02 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 | 11-02 – planting |
| 12-04, 12-10, 12-22 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 | 12-10 – planting |
| 12-23, 12-25, 12-27, 12-50, 12-51 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 12-23 – removal of pylon foundations only to a depth of 1.5m 12-51 – removal of pylon foundations only to a depth of 1.5m |
| 12-52, 12-54, 12-55 | Temporary use for access | Work No. 3 and Work No. 8 | |
| 13-01 | Temporary use for access | Work No. 8 | |
| 13-05 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 13-05 – removal of pylon foundations only to a depth of 1.5m |
| 13-14 | Temporary use for access | Work No. 8 | |
| 13-15 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | |
| 13-16, 13-17 | Temporary use for access | Work No. 3 and Work No. 8 | |
| 13-18 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 13-18 – removal of pylon foundations only to a depth of 1.5m |
| 13-19, 13-20, 13-24, 13-25, 13-26, 13-27, 13-28 | Temporary use for access | Work No. 3 and Work No. 8 | |
| 13-29, 13-30 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 13-30 – removal of pylon foundations only to a depth of 1.5m |
| 13-31, 13-32, 13-33 | Temporary use for access | Work No. 3 and Work No. 8 | |
| 14-06, 14-08 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 14-06 – planting |
| 14-17, 14-18, 14-20, 14-21, 14-22, 14-24, 14-27, 14-28, 14-30, 14-31, 14-32, 14-33, 14-34 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 14-24 – planting 14-31 – removal of pylon foundations only to a depth of 1.5m |
| 14-35, 14-37 | Temporary use for access | Work No. 3 and Work No. 8 | |
| 14-38, 14-39 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No.8 | 14-38 – removal of pylon foundations only to a depth of 1.5m |
| 14-40, 14-41, 14-42, 14-43, 14-44, 14-45, | Temporary use for access | Work No. 3 and Work No. 8 | |
| 15-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | |
| 15-10, 15-15, 15-17, 15-18 | Temporary use for access | Work No. 8 | |
| 15-19 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | |
| 15-20, 15-22, 15-23 | Temporary use for access | Work No. 3 and Work No. 8 | |
| 15-24 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | |
| 15-25 | Temporary use for access | Work No. 3 and Work No. 8 | |
| 15-26 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 15-26 – removal of pylon foundations only to a depth of 1.5m |
| 15-27 | Temporary use for access | Work No. 3 and Work No. 8 | |
| 15-28 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 15-28 – removal of pylon foundations only to a depth of 1.5m |
| 15-29 | Temporary use for access | Work No. 3 and Work No. 8 | |
| 15-31, 15-32 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 15-31 – removal of pylon foundations only to a depth of 1.5m |
| 15-33, 15-46, 15-47, 15-48, 15-49, 15-50, 15-51, 15-52, 15-53 | Temporary use for access | Work No. 3 and Work No. 8 | |
| 15-54, 15-55 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 15-55 – removal of pylon foundations only to a depth of 1.5m |
| 15-56, 15-57, 15-58, 15-63 | Temporary use for access | Work No. 3 and Work No. 8 | |
| 15-66, 15-69, 15-85, 15-86 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3, Work No. 4 and Work No. 8 | 15-85 – planting |
| 15-97, 15-99, 15-104, 15-110, 15-112, 15-114, | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 15-97 – planting |
| 16-03, 16-10, 16-14, 16-20, 16-22, 16-35 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | |
| 16-51, 16-54 | Temporary use for access | Work No. 4 and Work No. 8 | |
| 16-58 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 16-58 – removal of pylon foundations only to a depth of 1.5m |
| 16-65 | Temporary use for access | Work No. 4 and Work 8 | |
| 16-67, 16-69, 16-72, 16-73, 16-74, 16-84, 16-88 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | |
| 17-01 | Temporary use for access | Work No. 4 and Work No. 8 | |
| 17-13, 17-29, 17-30, 17-34, 17-35, 17-37, 17-42, 17-67, 17-68, 17-69 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 17-34 – planting 17-35 – planting 17-37 – planting 17-42 – removal of pylon foundations only to a depth of 1.5m 17-68 – removal of pylon foundations only to a depth of 1.5m |
| 17-70 | Temporary use for access | Work No. 4 and Work No. 8 | |
| 17-104, 17-108, 17-109 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 17-109 – removal of pylon foundations only to a depth of 1.5m 17-109 – planting |
| 19-08 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 19-08 – removal of pylon foundations only to a depth of 1.5m |
| 19-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 | 19-16 – removal of pylon foundations only to a depth of 1.5m |
| 19-24, 19-25, 19-26 | Temporary use for access | Work No. 5 and Work No. 8 | |
| 19-29, 19-30, 19-31, 19-32, 19-34, 19-36 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 | |
| 20-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 | |
| 20-06, 20-07 | Temporary use for access | Work No. 5 and Work No. 8 | |
| 20-10 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 | |
| 20-13, 20-14, 20-15, 20-16 | Temporary use for access | Work No. 5 and Work No. 8 | |
| 20-46, 20-47, 20-48 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 | |
| 20-53 | Temporary use for access | Work No. 5 and Work No. 8 | |
| 20-57, 20-58 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 | 20-58 – removal of pylon foundations only to a depth of 1.5m |
| 21-01, 21-03, 21-04, 21-05, 21-06, 21-07, 21-09, 21-10, 21-11, 21-12, 21-13, 21-14 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 | 21-04 – removal of pylon foundations only to a depth of 1.5m 21-09 – removal of pylon foundations only to a depth of 1.5m |
| 21-15, 21-16, 21-17, 21-18, 21-19 | Temporary use for access | Work No. 8 | |
| 21-20, 21-21 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 21-21 – removal of pylon foundations only to a depth of 1.5m |
| 21-22 | Temporary use for access | Work No. 8 | |
| 21-23 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | |
| 21-24 | Temporary use for access | Work No. 8 | |
| 21-25 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 21-25 – removal of pylon foundations only to a depth of 1.5m |
| 21-26, 21-27, 21-28, 21-29, 21-30, 21-31, 21-32 | Temporary use for access | Work No. 7 and Work No. 8 | |
| 21-33, 21-34, 21-35 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 7 and Work No. 8 | |
| 21-36 | Temporary use for access | Work No. 7 and Work No. 8 | |
| 21-37, 21-38 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 7 and Work No. 8 | 21-38 – removal of pylon foundations only to a depth of 1.5m |
| 21-39, 21-40 | Temporary use for access | Work No. 7 and Work No. 8 | |
| 21-41, 21-42, 21-44, 21-47, 21-49, 21-50, 21-51, 21-52, 21-55, 21-56, 21-57, 21-58, 21-59, 21-61 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 7 and Work No. 8 | |
| 21-62, 21-63, 21-64, 21-65 | Temporary use for access | Work No. 7 and Work No. 8 | |
| 21-66, 21-67, 21-68, 21-69, 21-70, 21-71 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 7 and Work No. 8 | 21-68 – removal of pylon foundations only to a depth of 1.5m 21-71 – removal of pylon foundations only to a depth of 1.5m |
| 21-72 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 | |
| 21-73 | Temporary use for access | Work No. 10 | |
| 22-01 | Temporary use for access | Work No. 10 | |
| 22-02 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 | |
| 22-03, 22-04, 22-05, 22-06, 22-07, 22-08, 22-09, 22-10, 22-11, 22-12 | Temporary use for access | Work No 10 | |
| 22-13 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 | |
| 22-14, 22-15, 22-16, 22-17, 22-18, 22-19 | Temporary use for access | Work No. 10 | |
| 22-20 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 | |
| 22-21 | Temporary use for access | Work No. 10 | |
| 22-22, 23-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 | |
| 23-02, 23-03 | Temporary use for access | Work No. 10 | |
| 23-04 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 9 and Work No. 10 and Work No. 11 | |
| 23-06, 23-07, 23-08, 23-09, 23-10 | Temporary use for access | Work No. 10 | |
| 23-11, 23-16, 23-15, 23-18, 23-21, 23-22, 23-25 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 9, Work No. 10 and Work No. 11 | |
| 23-26, 23-27 | Temporary use for access | Work No. 9, Work No. 10 and Work No. 11 | |
| 23-33, 23-37, 23-45, 23-47, 23-49, 23-55 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 9 and Work No. 10 and Work No. 11 | |
| 23-50, 23-51, 23-53, 23-54, 23-56 | Temporary use for access | Work No. 9 and Work No. 10 and Work No. 11 | |
| 23-57 | Temporary use for access | Work No. 9 and Work No. 10 and Work No. 11 | |
| 23-58, 23-59, 23-60 | Temporary use for access | Work No. 9 and Work No. 10 and Work No. 11 | |
| 24-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No 10 | |
| 24-02, 24-03, 24-04 | Temporary use for access | Work No 10 | |
| 24-05, 24-06, 24-07 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No 10 | |
| 24-08 | Temporary use for access | Work No. 10 | |
| 24-09 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 | |
| 24-10, 24-11, 24-12, 24-13, 24-14, 24-15 | Temporary use for access | Work No. 10 | |
| 24-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 | |
| 24-17 | Temporary use for access | Work No. 10 | |
| 24-18 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 | |
| 24-19, 24-20 | Temporary use for access | Work No. 10 | |
| 24-21 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 | |
| 24-22, 24-23 | Temporary use for access | Work No. 10 | |
| 24-24 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 | |
| 24-25, 24-26, 24-27, 24-28 | Temporary use for access | Work No. 10 | |
| 25-02, 25-03, 25-04, 25-05, 25-06, 25-07, 25-09, 25-10, 25-11, 25-12 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 | |
| 25-13 | Temporary use for access | Work No. 11 | |
| 26-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 | |
| 26-02, 26-03 | Temporary use for access | Work No. 11 | |
| 26-04 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 | |
| 26-05, 26-06, 26-07 | Temporary use for access | Work No. 11 | |
| 26-08 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 | |
| 26-09 | Temporary use for access | Work No. 11 | |
| 26-10 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 | |
| 26-11, 26-12, 26-13, 26-14, 26-15 | Temporary use for access | Work No. 11 | |
| 26-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 | |
| 27-09, 27-30, 27-31, 27-33, 27-36, 27-38, 27-46, 27-47, 27-48, 27-56 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 7 | |
| 27-49, 27-52 | Temporary use for access | Work No. 5 and Work No. 7 | |
| 28-01, 28-02, 28-18, 28-19, 28-22, 28-23, 28-24, 28-25, 28-27, 28-28, 28-29, 28-33, 28-37, 28-44, 28-58 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5, Work No. 6 and Work No. 7 |