Article 4 Development consent etc. granted by the OrderI1
England, Wales and Scotland
(1)
Subject to the provisions of this Order and to the requirements in Schedule 2 (requirements) the undertaker is granted development consent for the authorised development to be carried out within the Order limits.
(2)
The undertaker may install, and keep installed, above ground the electric lines included in the authorised development.
(3)
Subject to article 6 (limits of deviation) the authorised development shall be constructed and installed in the lines and situations shown on the works plans and in accordance with the levels shown on the sections.
Annotations
Commencement
- I1
Art. 4 in force at 7.5.2014, see art. 1