OpenLegislation

Article 48 Certification of plans, etc.I1

England, Wales and Scotland

(1)

National Grid must, as soon as practicable after the making of this Order, submit to the Secretary of State copies of—

(a)

the access, rights of way and public rights of navigation plan (Document 2.7.1 – 2.7.6);

(b)

the arboricultural impact assessment (Document 5.3.3I);

(c)

the book of reference (Document 4.3);

(d)

the environmental statement (Documents 5.1 to 5.4.18, 5.2.19 and 5.2.22);

(e)

the code of construction practice (Document 5.3.3B);

(f)

the archaeological written scheme of investigation (Document 5.3.3C);

(g)

the biodiversity mitigation strategy (Document 5.3.3D);

(h)

the construction traffic management plan (Document 5.3.3F);

(i)

the public rights of way management plan (Document 5.3.3G);

(j)

the noise and vibration management plan (Document 5.3.3H);

(k)

the outline landscape mitigation strategy (Figure 3.10 – 3.12 F1... F2in Document 5.4.3);

(l)

the outline soil management plan (Document 5.3.3E);

(m)

the design drawings (Document 2.15);

(n)

the land plan (Document 2.5.1–2.5.6);

(o)

the extinguishment of easements, servitudes and other private rights plan (Document 2.14);

(p)

the traffic regulation order plan (Document 2.12.1–2.12.6);

(q)

the works plan (Document 2.6.1–2.6.6);

(r)

the design approach to site specific infrastructure (Document 8.18);

for certification that they are true copies of the documents referred to in this Order.

(2)

A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

Annotations

Textual amendments

F1

Art. 48(k): comma omitted (12.6.2024) by virtue of The National Grid (Yorkshire Green Energy Enablement Project) (Corrections) Order 2024 (S.I. 2024/811), art. 1, Sch. 1

F2

Word in art. 48(k) inserted (12.6.2024) by The National Grid (Yorkshire Green Energy Enablement Project) (Corrections) Order 2024 (S.I. 2024/811), art. 1, Sch. 1

Commencement

I1

Art. 48 in force at 5.4.2024, see art. 1