OpenLegislation

Schedule 1 SCHEDULED WORKS

Original text. Later amendments are not shown.

In the County of Derbyshire, District of High Peak—

Work No. 1 – A railway (695 metres in length) forming an extension of existing sidings commencing at a point 150 metres east of the junction of Williamson Avenue with Ladycroft and terminating at a point 355 metres south of the junction of Brown Edge Road with Footpath FP4.

Work No. 2 – A footbridge (42 metres in length) commencing at a point 140 metres east of the junction of Brown Edge Road with Brown Edge Close and terminating at a point 230 metres north-west of the junction of Nunsfield Road with Barms Way.

Work No. 3 – A diversion of an electricity cable (35 metres in length) commencing beneath a point 140 metres east of the junction of Brown Edge Road with Brown Edge Close and terminating beneath a point 180 metres east of that junction.