Paragraph 62 Guided busway property: notification, protective works
(1)
Subject to sub-paragraph (2), Network Rail must give to the engineer not less than 28 days’ notice of its intention to—
(a)
commence the construction of any of the specified works; and
(b)
carry out any works for the repair or maintenance of the specified works in so far as such works of repair or maintenance affect or interfere with the guided busway property.
(2)
Network Rail is not required to comply with sub-paragraph (1) in a case of emergency but in that case Network Rail must give to the operator notice as soon as is reasonably practicable.