Article 2 Interpretation
In this Order—
-
“the 1961 Act” means the Land Compensation Act 1961f1;
-
“the 1965 Act” means the Compulsory Purchase Act 1965f2;
-
“the 1980 Act” means the Highways Act 1980f3;
-
“the 1981 Act” means the Compulsory Purchase (Vesting Declarations) Act 1981f4;
-
“the 1990 Act” means the Town and Country Planning Act 1990f5;
-
“the 1991 Act” means the New Roads and Street Works Act 1991f6;
-
“address” includes any number or address used for the purposes of electronic transmission;
-
“book of reference” means the book of reference certified by the Secretary of State as the book of reference for the purposes of this Order;
-
“bridleway” has the same meaning as in the 1980 Act;
-
“building” includes any structure or erection or any part of a building, structure or erection;
-
“definitive map” means the document published by Nottinghamshire County Council that records the existence of public rights of way in Nottinghamshire;
-
“deposited plan” means the land and rights of way plan certified by the Secretary of State as the deposited plan for the purposes of this Order;
-
“development” means the development authorised by a grant of planning permission under the 1990 Act, with the reference number V/2017/0606 dated 18th December 2017 from Ashfield District Council comprising a ramped bridleway bridge across the railway, and any variation or replacement of that planning permission;
-
“electronic transmission” means a communication transmitted—
- (a)
by means of an electronic communications network; or
- (b)
by other means but while in electronic form;
- (a)
-
“existing bridleway” means the bridleway recorded on the definitive map and shown between points A and B on the deposited plan and the bridleway shown between points A to C to B on the deposited plan;
-
“highway authority” has the same meaning as in the 1980 Act;
-
“Kings Mill No. 1 level crossing” is the crossing of the Nottingham to Worksop railway, grid reference E:451993, N:359681, on the level at Mansfield in the county of Nottinghamshire, which has the status of a bridleway;
-
“maintain” includes inspect, repair, adjust, alter, remove, reconstruct and replace, and maintenance is to be construed accordingly;
-
“Network Rail” means Network Rail Infrastructure Limited (Company No. 02904587) whose registered office is at 1 Eversholt Street, London, NW1 2DN;
-
“the new public right of way” means the new bridleway between points D, E, F, G and H shown on the deposited plan;
-
“the Order limits” means the limits of land to be acquired or used shown on the deposited plan;
-
“owner”, in relation to land, has the same meaning as in section 7 (interpretation) of the Acquisition of Land Act 1981f7;
-
“statutory undertaker” means—
- (a)
any person who is a statutory undertaker for the purposes of the 1990 Act; and
- (b)
any public communications provider within the meaning of section 151(1) of the Communications Act 2003f8;
- (a)
-
“the tribunal” means the Lands Chamber of the Upper Tribunal; and
-
“the undertaking” means the railway undertaking of Network Rail as existing from time to time;
References in this Order to points identified by letters are construed as references to a point so shown on the deposited plan.
References in this Order to numbered plots are references to plot numbers shown on the deposited plan.
Annotations
Footnotes
- f1
- f2
- f3
- f4
- f5
- f6
- f7
- f8