Part 1 STREETS TO BE STOPPED UP (FOR WHICH A SUBSTITUTE IS TO BE PROVIDED)
(1) Area | (2) Street to be stopped up | (3) Extent of stopping up | (4) New street to be substituted |
|---|---|---|---|
| City of Peterborough | Cock Lane Footpath | Between points P1A, P1, P2, P3 and P4 | A footpath between points P1A, P1, P5, Work No. 3 and point P4 |
| Existing stepped footway to A15 southbound | Between points P5 and P6 | A footpath between points P5, P6, P7, P8, Work No. 6 and point P6 |