Regulation 15 Risk map
United Kingdom
An occupier of a holding who spreads organic manure on that holding must produce and maintain a map of the holding (a “risk map”) which shows the following—
each field, with its area in hectares;
all surface waters;
any boreholes, springs or wells on the holding or within 50 metres of the boundary of the holding;
areas with sandy or shallow soils;
land with an incline greater than 12 degrees;
land within 10 metres of surface waters;
land within 50 metres of a borehole, spring or well;
land drains (other than a sealed impermeable pipe);
sites suitable for temporary field heaps if this method of storing manure is to be used;
land that has a low run-off risk.
The information under paragraph (1)(j) need not be included in a risk map produced by an occupier who does not intend to spread manure on land that has a low run-off risk during the storage period as referred to in regulation 25.
Where a change in circumstances affects a matter referred to in paragraph (1), the occupier must update the risk map within three months of the change.
The occupier must keep a copy of the risk map for the holding.
Paragraph (1) does not apply to a holding on which organic manure is spread only in a greenhouse.