OpenLegislation

Paragraph 3 E1

England, Wales and Scotland

The F1approved body must:

  • — examine whether the equipment has been manufactured in conformity with the technical documentation

  • — agree with the applicant the location where, in accordance with F2these Regulations, the noise tests will be carried out

  • — in accordance with these Regulations, carry out or have carried out the necessary noise tests.

Annotations

Textual amendments

F1

Word in Sch. 10 para. 3 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 8 para. 23(c)(i) (with Sch. 8 para. 14) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)

F2

Words in Sch. 10 para. 3 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 8 para. 23(c)(ii) (with Sch. 8 para. 14) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)

Extent

E1

This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only

Notes on the whole SI

Textual amendments

F1

S.I. 2000/3238.

F2

1972 c. 68.