Paragraph 3 E1
England, Wales and Scotland
The F1approved body must:
— examine whether the equipment has been manufactured in conformity with the technical documentation
— agree with the applicant the location where, in accordance with F2these Regulations, the noise tests will be carried out
— in accordance with these Regulations, carry out or have carried out the necessary noise tests.
Annotations
Textual amendments
- F1
Word in Sch. 10 para. 3 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 8 para. 23(c)(i) (with Sch. 8 para. 14) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Words in Sch. 10 para. 3 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 8 para. 23(c)(ii) (with Sch. 8 para. 14) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
Extent
- E1
This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only
Notes on the whole SI
Textual amendments
- F1
- F2