Paragraph 2.3 Test of powered equipment under load
For these measurements, the engine (driving device) and hydraulic system of the equipment must be warmed up in accordance with the instructions, and safety requirements must be observed. No signalling device such as a warning horn or reversing alarm is to be operated during the test.
Notes on the whole SI
Textual amendments
- F1
- F2
Notes on Schedule 6
Extent
- E1
This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only