Paragraph Operating conditions during test

If the machine is equipped with a boom, this is set upright and the pipe shall be led back to the filler funnel. If this is not the case the machine shall be equipped with a horizontal pipe of at least 30 m leading back to the filler funnel.

Notes on the whole SI

Textual amendments

F1

S.I. 2000/3238.

F2

1972 c. 68.

Notes on Schedule 6

Extent

E1

This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only