Paragraph Operating conditions during test
If the machine is equipped with a boom, this is set upright and the pipe shall be led back to the filler funnel. If this is not the case the machine shall be equipped with a horizontal pipe of at least 30 m leading back to the filler funnel.
Notes on the whole SI
Textual amendments
- F1
- F2
Notes on Schedule 6
Extent
- E1
This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only