The mobile crane shall be loaded with a load which creates 50% of the maximum rope force. The test consists of hoisting of the load and the immediately following lowering to the starting position. The length of the boom shall be chosen so that the full test lasts 15 to 20 seconds.
(b)
Slewing
Notes on the whole SI
Textual amendments
- F1
- F2
Notes on Schedule 6
Extent
- E1
This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only