OpenLegislation

Paragraph 3.2 Installation of the measuring equipment

Original text. Later amendments are not shown.

The instrumentation and sample probes shall be installed as required. When using a full flow dilution system for exhaust gas dilution, the tailpipe shall be connected to the system.