Article 10 Public rights of wayI1
England and Wales
The undertaker may, in connection with the carrying out of the authorised project, temporarily stop up each of the public rights of way specified in column (2) of Parts 1 and 2 of Schedule 3 (public rights of way to be temporarily stopped up) to the extent specified in column (3) of Part 1 of Schedule 3 in the event of scenario 1, or Part 2 of Schedule 3 in the event of scenario 2, by reference to the letters shown on the temporary stopping up of public rights of way plan.
Annotations
Commencement
- I1
Art. 10 in force at 1.1.2022, see art. 1