Part 4 Conditions
England and Wales
- 1Design parameters
- 2Design parameters
- 3Phasing of the authorised scheme
- 4Notifications and inspections
- 5Aids to navigation
- 6Colouring of structures
- 7Chemicals, drilling and debris
- 8Force majeure
- 9Pre-construction plans and documentation
- 10Pre-construction plans and documentation
- 11Post-construction plans and documents
- 12Reporting of engaged agents, contractors and vessels
- 13Pre-construction monitoring and surveys
- 14Construction monitoring
- 15Post construction
- 16Reporting of impact pile driving
- 17Reporting of scour and cable protection
- 18Coordination with Norfolk Vanguard Offshore Wind Farm
- 19Restriction on cable installation construction works