Paragraph 3 Design parametersI1
England and Wales
The total length of the cables and the area and volume of their cable protection must not exceed the individual distributions set out in Table 2 of the outline scour protection and cable protection plan and must not exceed the following—
| Work | Length | Cable protection (m3) | Cable protection (m2) |
|---|---|---|---|
| Work No. 1(e) and (f) (array) | 600 kilometres | 198,500 m3 | 389,000 m2 |