Paragraph 6 Detailed offshore design parametersI1

England, Wales and Scotland

(1)

In relation to a wind turbine generator, each foundation using piles must not have—

(a)

more than four driven piles;

(b)

in the case of single pile structures, a pile diameter which is more than 15 metres; or

(c)

in the case of two or more pile structures, have a pile diameter which is more than five metres.

(2)

In relation to a wind turbine generator, each foundation must not have a seabed footprint area (excluding scour protection) of greater than 1,963 m2.