The total length of the cable circuits in Work Nos. 2, 3 and 4A, and the area and volume of their cable protection (including cable crossings) must not exceed the following—

(1)

Work No.

(2)

Parameter

(3)

Value

Work No. 2Maximum total length20 km
Maximum protection area24,000 m2
Maximum protection volume14,000 m3
Work Nos. 3 and 4AMaximum total length125.4 km
Maximum protection area75,240 m2
Maximum protection volume43,890 m3