Article 6 Amendments to Part 2 (Building heights) of Schedule 1 (Authorised development)
In Part 2 (Building heights) of Schedule 1 (Authorised development), omit the table and substitute it with the following table—
(1) (2) Building Height (metres) above ordnance datum Heat recovery steam generator 47 Turbine hall 35 Main stack 85 Hybrid cooling tower (bank 1) 28 Hybrid cooling tower (bank 2) 28 Administration building 17 Warehouse 25 Water treatment plant 13 Break tank 22 Gas insulated switchgear building 17 Covered fuel storage 40 Biomass storage silos 50 Limestone storage silos 50 Gasifier, including fuel preparation facility 70 Air separation unit 50 Oxygen storage tank 25 Acid gas removal 65 Wastewater treatment plant 25 Electrical switching station 1 25 Electrical switching station 2 15 Electrical switching station 3 15 Flare stack 140 Auxiliary boiler and stack 15